My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150237 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150237 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2016 2:32:35 PM
Creation date
3/28/2013 12:42:44 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-040
C150237
Contractor Name
Penrose Water District
Contract Type
Loan
County
Fremont
Bill Number
SB 07-122
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Loan Feasibility Study for <br />Raw Water Acquisition and Utilization <br />Page 42 <br />With respect to developing future projections for expenditures including new debt service and <br />determining their ultimate impact on the District's users, basic financial data is required at the onset. <br />The District currently has 1,701 users connected to its system with an additional 137 ERUs based <br />upon water consumption. Thus the total number of ERUs connected to the District's system is <br />currently 1,838. COLOTRUST funds accrued specifically as a result of the revenues generated from <br />the 3.000 mill levy stand at $325,565 as of July 2006. With the first CWCB loan payment projected <br />to occur in 2011, additional proceeds will be contributed to that restricted account for the years <br />leading up to that payment. The mill levy is projected at this time to generate approximately <br />$66,000 of annual income (at current assessed valuation). Subtracting Fremont County's 3% fee for <br />collection and handling, the District will net approximately $64,000 on average annually as available <br />revenue toward debt service. As detailed in Table 13, the Series 2003 Water Revenue Bond will be <br />retired in 2012. Thus beginning in 2013, the District will have on average approximately $171,875 <br />of debt service freed up enabling the District to apply that amount toward serving the new CWCB <br />loan. The District anticipates utilizing retained earnings to provide a similar order of magnitude of <br />payment as that of the 2003 Refunding Bonds toward CWCB debt service in 2011 and 2012 with <br />subsequent years utilizing the revenues that have previously been applied to the 2003 Refunding <br />Bond issue. Based upon the areas in which available resources have been identified to apply toward <br />debt service, Table 14 recaps both the available and additional funding that is required. <br />Table 14 <br />Penrose Water District <br />Sources of Revenue for CWCB Debt Service <br />Activity <br />Cost <br />New CWCB debt service (based on $8,757,000 at 3.25 1/o/30 years) <br />$461,334 <br />Savings on EMIAXSDA RD payments applied to new debt service <br />($21,689) <br />Revenues applied to debt service from 3.000 mill levy average net <br />annual income stream <br />($64,000) <br />Payments applied from savings from retirement of 2003 Refunding <br />Bond issue and cash on hand contributed for 2011 and 2012 <br />($171,875) <br />Total Additional Required Revenue <br />$203,770 <br />With 1,838 ERUs connected to the system, the equivalent ERU cost per month for the added debt <br />service will be approximately $9.24. The anticipation on the District board's part is that by 2010 in <br />preparation for the first annual CWCB payment due in 2011, the base water charge or a combination <br />of the base water charge and the consumptive charge will be modified to generate the equivalent of <br />approximately $9.25 per ERU per month in added revenue. Colorado DOLA calculates average <br />monthly household water service charges on an annual basis. For the year 2005, the statewide <br />average monthly water bill was $32.45. That amount decreased from previous years based upon a <br />decline in water charges as a result of drought related restrictions. In 2005, the audited average <br />monthly ERU water bill in the Penrose Water District was $31.75. The projected ultimate increase <br />of $9.25 per ERU for debt service will raise the average monthly water bill to $41.00. That amount <br />Leonard Rice Engineers, Inc. August 2006 — 1018PEN05 <br />GMS, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.