My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150237 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150237 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2016 2:32:35 PM
Creation date
3/28/2013 12:42:44 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-040
C150237
Contractor Name
Penrose Water District
Contract Type
Loan
County
Fremont
Bill Number
SB 07-122
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Loan Feasibility Study for <br />Raw Water Acquisition and Utilization <br />Page 28 <br />Table 5 <br />Alternative 3 - Opinion of Probable Cost <br />Continued <br />Item <br />Description <br />Quantity <br />I Unit Cost <br />Total Cost <br />BRUSH HOLLOW RESERVOIR ENLARGEMENT <br />Non Construction Items <br />• Permitting Requirements 2) 3> <br />1. <br />Individual 404 Permit <br />1 LS <br />$125,000 <br />$125,000 <br />2. <br />401 Certification <br />1 LS <br />$5,000 <br />$5,000 <br />3. <br />State Engineer Office Approval of Dam Design <br />1 LS <br />$10,000 <br />$10,000 <br />4. <br />CLOMR/LOMR Analysis and Permit <br />1 LSJ <br />$100,000 <br />$100,000 <br />Subtotal Non Construction Items <br />$240,000 <br />Construction Items <br />• Reservoir Enlargement <br />1. <br />Excavation dam <br />11,330 CY <br />$5 <br />$56,650 <br />2. <br />Excavation borrow <br />17,680 CY <br />$5 <br />$88,400 <br />3. <br />Hauling <br />17,680 CY <br />$5 <br />$88,400 <br />4. <br />Fill <br />29,010 CY <br />$6 <br />$174,060 <br />5. <br />Riprap <br />1,200 CY <br />$10 <br />$12,000 <br />6. <br />Concrete <br />55 CY <br />$150 <br />$8,250 <br />7. <br />Supervision <br />2 EA <br />$30,000 <br />$60,000 <br />Subtotal Construction <br />$487,760 <br />Construction Contingencies (20 %) <br />$97,552 <br />Engineering of Reservoir Enlargements <br />$100,000 <br />Subtotal Construction Items <br />$685,312 <br />Subtotal Brush Hollow Reservoir Enlargement <br />$925,312 <br />Inflation Allowance (3 yrs @ 5% per yr) <br />$145,852 <br />Brush Hollow Reservoir Enlargement Total <br />$1,071,164 <br />GENERAL <br />Supporting Legal Services <br />$90,000 <br />Administration (advertising, audits, etc.) <br />$20,000 <br />Total General <br />$110,000 <br />PROJECT TOTAL <br />$9,729,926 <br />1) Total cost represents present value of a 30 -year lease <br />2) Opinion of Cost assumes that the natural resources assessment does not identify any threatened or endangered <br />species within the project impact area <br />3) Note: Dewatering and stormwater permits related to actual construction included in construction costs as <br />contractor requirement <br />4) Inflation allowance not applied to augmentation plan. <br />Leonard Rice Engineers, Inc. August 2006 - 1018PEN05 <br />GMS, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.