My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150227 Final Report
CWCB
>
Grants
>
DayForward
>
C150227 Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2013 7:43:05 AM
Creation date
3/26/2013 1:12:58 PM
Metadata
Fields
Template:
Grants
Applicant
South Platte Ditch Company
Grant Type
Non-Reimbursable
Fiscal Year (i.e. 2008)
2006
Project Name
Canal Modernization and Radio Telemetry Demonstration Project
CWCB Section
Finance
Contract/PO #
C150227
Grants - Doc Type
Final Deliverables
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Figure 10. Shop built enclosure to keep controls and electronics separate and weather <br />tight. <br />To access the gate controls the ditch rider opens the small box on the left side. He can <br />then operate each gate independently with a manual up -off- down toggle switch, change <br />from manual to automatic mode or access any of the features of the program operating <br />the system. Using a 16 button keypad access can be gained to an on screen menu for <br />features of the program you want to work with. This system is also password protected <br />for security reasons. Figure 11 shows the controls in the small box on the left side of the <br />enclosure. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.