My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150227 Final Report
CWCB
>
Grants
>
DayForward
>
C150227 Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2013 7:43:05 AM
Creation date
3/26/2013 1:12:58 PM
Metadata
Fields
Template:
Grants
Applicant
South Platte Ditch Company
Grant Type
Non-Reimbursable
Fiscal Year (i.e. 2008)
2006
Project Name
Canal Modernization and Radio Telemetry Demonstration Project
CWCB Section
Finance
Contract/PO #
C150227
Grants - Doc Type
Final Deliverables
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Figure 8. Overshot Gate at the SPDC Spill Structure <br />A three -bay check structure immediately downstream from the spill gates currently <br />features three hand -wheel operated vertical slide gates. SPDC has motorized two of these <br />gates and will install gate position sensors on all three. Once this is completed, a CDI <br />radio /control unit will control automation of the overshot gate to maintain a target <br />upstream water level and calculate gate - measured spill discharge. The same CDI unit <br />will control the motorized gate in the adjacent check to maintain a target flow rate at the <br />SPDC main flume. <br />The gates in the canal are motorized and driven the same way as the gate in figure 7 using <br />a 12 volt motor and #50 chain driving a sprocket attached to the wheel of the gate. Figure <br />9 is a picture of the drive system with all protective shields removed for the picture. <br />11 <br />