Laserfiche WebLink
I <br />" mm 6-AC-02A (Ft 5/651 ' <br />/h 3y67 5a 7,9X <br />ATTACII -1ENT A <br />FEASIBILITY REPORT <br />CONTRACT <br />fit , 'EN r OR AGENCY NUMBER <br />I -04 -00 <br />rN @ KACT ROUTING NUMBER <br />9 71^/03 <br />$68,560 <br />THIS CONTRACT. made this 1St day of July 198 6 . by and between the <br />Slate of Colorado for the use and benefit of the Department of 'I Natural Resources <br />__(_Colorado Water Conservation Board), <br />hereinafter referred to as the State. and '2 the City of Greeley, Civic Center Complex, <br />919 7th St., Greeley, CO 80631, <br />hereinafter referred to as the contractor. <br />WHEREAS. authority exists in the Law and Funds have b udgeted: 4ppropriated and otherwise made <br />available and a sufficient unencumbered balance thereof remai available for pay nt in Fund Number 4008 <br />GIL Account Number 5 2 7 4 X . Contract Encumbrance Nu or a2967. an <br />ABL Account Number 12740, Orq. Uni 77 -77 -777 <br />WHEREAS. required approval. clearance and coordination ka beerr-i omplished from and with appropriate <br />agencies; and <br />WHEREAS, pursuant to the provisions of section 37 -60 -119, <br />Colorado Revised Statutes, as amended, the State is authorized <br />to construct certain water.projects for the benefit of the <br />people of the State of Colorado; and <br />WHEREAS. the City of Greeley has made application to the <br />State for the rehabilitation of three of its dams, such <br />improvement of the facilities is hereinafter sometimes referred <br />to as the_project; and <br />WHEREAS, the Contractor i <br />Colorado; <br />NOW THEREFORE, it is here <br />1. The Contractor shall hav% <br />and directed to the problem of en <br />dams of Comanche, Peterson. and,,9' <br />proposal for a project feasibil t. <br />consulting engineering firm of Mti" <br />(the Consultant). and approved by <br />1986, which proposal is attached <br />part of this contract. <br />.e State of <br />'a %�*,i,i flity report prepared <br />q and rehabilitating the <br />Vkh" Lakes in accordance with a <br />!V— eport prepared by the <br />rrison- Knudsen Engineers, Inc. <br />the State, received June 16, <br />hereto as Exhibit A and made a <br />2. Fifteen (15) copies of the final report called for in <br />this contract shall be furnished to the State not later than <br />October 31, 1986, unless such time is extended by mutual <br />agreement of the parties hereto in writing. <br />3. As compensation for the services of the Contractor, the <br />State shall pay to the Contractor the sum of Sixty -Eight <br />Thousand Five Hundred Sixty Dollars ( #68.560) in the manner <br />following: <br />a. Sixty percent (60 %). to wit, Forty -One Thousand One <br />Hundred Thirty -Six Dollars ($41,136) of the total amount <br />due in two (2) monthly installments of Twenty Thousand <br />Five Hundred Sixty -Eight Dollars ($20,568) each, commencing <br />on August 1, 1986. <br />b. The remaining forty percent (40 %). to wit, Twenty -Seven <br />Thousand Four Hundred Twenty -Four Dollars ($27,424) <br />within forty (40) days following receipt and acceptance <br />of the written report specified in paragraph 2 of this <br />contract. <br />39HAOI''10'N <br />ATTACHMENT A <br />Page I of 4 pages <br />'1 See instrucliuns on reverse of last page.) <br />10800 <br />