My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Analysis of Colorado-Big Thompson Project Operation With Respect to East Slope Diversions and Non-Charge Deliveries
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Analysis of Colorado-Big Thompson Project Operation With Respect to East Slope Diversions and Non-Charge Deliveries
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2013 4:58:00 PM
Creation date
3/6/2013 3:29:32 PM
Metadata
Fields
Template:
Water Supply Protection
Description
For the River Colorado Water Conservancy District
State
CO
Basin
South Platte
Colorado Mainstem
Water Division
1
Date
10/1/2000
Author
Helton & Williamsen, P.C.
Title
Analysis of Colorado-Big Thompson Project Operation with Respect to East Slope Diversions and Non-charge Deliveries
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Hal D. Simpson, Colorado State Engineer <br />October 6, 2000 <br />Page 4 <br />We would appreciate the opportunity to meet and discuss these matters with <br />you and your staff so we can all have a better understanding of the actual accounting <br />practices and available records and how any deficiencies will be corrected. <br />Sincerely, <br />R. Eric Kuhn <br />General Manager <br />REK/skl <br />cc: CRWCD Board of Directors <br />Ken Salazar <br />Dan McAuliffe <br />Greg Walcher - <br />Eric Wilkinson <br />Duane Helton <br />nnett Raley <br />avid Hallford <br />Anne Castle <br />Peter Houtsma <br />• <br />• <br />• <br />a <br />
The URL can be used to link to this page
Your browser does not support the video tag.