My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Analysis of Colorado-Big Thompson Project Operation With Respect to East Slope Diversions and Non-Charge Deliveries
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Analysis of Colorado-Big Thompson Project Operation With Respect to East Slope Diversions and Non-Charge Deliveries
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2013 4:58:00 PM
Creation date
3/6/2013 3:29:32 PM
Metadata
Fields
Template:
Water Supply Protection
Description
For the River Colorado Water Conservancy District
State
CO
Basin
South Platte
Colorado Mainstem
Water Division
1
Date
10/1/2000
Author
Helton & Williamsen, P.C.
Title
Analysis of Colorado-Big Thompson Project Operation with Respect to East Slope Diversions and Non-charge Deliveries
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� M M M M M = = = = = = M = = = M = M = <br />Helton & Williamsen <br />CAC706 \Table t.xls 9/27/00 <br />TABLE 1 <br />PERTINENT DATA SUMMARIZING THE C -BT PROJECT'S EAST SLOPE WATER RIGHTS <br />---- - - - - -- -Date of------- <br />- - - - -- <br />Original <br />Structure <br />Source(s) <br />Amount(s) <br />Adjudication <br />Appropriation <br />Decree <br />L1.1. <br />(A <br />W <br />Ll <br />iii <br />W <br />Olympus Tunnel <br />Big Thompson <br />550 cfs Abs. <br />November 14, 1939 <br />September 14, 1933 <br />Civil Action No. 10077 <br />(decreed as the <br />Boulder County <br />Estes Park- Foothills <br />District Court <br />Power System) <br />Dille Tunnel (decreed as <br />Big Thompson <br />385 cfs Abs. <br />November 14, 1939 <br />September 14, 1933 <br />Civil Action No. 10077 <br />the Horsetooth Supply <br />Boulder County <br />Canal) <br />District Court <br />Carter Lake Reservoir <br />Big Thompson <br />11,480 acre -feet Abs. <br />November 14, 1939 <br />September 14, 1933 <br />Civil Action No. 10077 <br />27.132 acre -feet Cond. <br />Boulder County <br />38,612 acre -feet Total <br />District Court <br />Horsetooth Reservoir <br />Big Thompson <br />22,528 acre -feet Abs. <br />November 14, 1939 <br />September 14, 1933 <br />Civil Action No. 10077 <br />37.472 acre -feet Cond. <br />Boulder County <br />60,000 acre -feet Total <br />District Court <br />North Poudre Supply Canal <br />Cache La Poudre <br />250 cfs Abs. <br />September 10, 1953 <br />January 12, 1943 <br />Case 11217 <br />Larimer County <br />District Court <br />Horsetooth Reservoir <br />Spring, Dixon, and Soldier <br />7,985 acre -feet Abs. <br />September 10, 1953 <br />October 15, 1935 <br />Case 11217 <br />Creeks <br />2.015 acre -feet Cond. <br />Larimer County <br />10,000 acre -feet Total <br />District Court <br />Boulder Reservoir <br />Big Thompson, Left Hand <br />10,591 acre -feet Abs. <br />February 25, 1971 <br />April 19, 1954 <br />Case No. 20716 <br />Creek, Dry Creek, Boulder <br />2.679 acre -feet Cond. <br />Boulder County <br />Creek <br />13,180 acre -feet Total <br />District Court <br />Helton & Williamsen <br />CAC706 \Table t.xls 9/27/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.