Laserfiche WebLink
Task Description <br />A Vegetation Dynamics Processes <br />1 Vegetation demography - develop data collection protocol <br />(methods, locations, timina. analvsis approach) <br />2 Vegetation demography - field data collection <br />3 Vegetation demography - analysis <br />4 Vegetation interaction with hydraulics and sediment transport - <br />develop data collection protocol (methods, locations, timing, <br />analvsis approach) <br />5 Vegetation interaction with hydraulics and sediment transport - <br />field data collection (depth, velocity, bed material, bedload <br />transport, change in site topography) at and near vegetation <br />tiamnnranhv anti nntantinliv nthar calartari citac <br />6 Vegetation interaction with hydraulics and sediment transport - <br />analysis of data (develop relationships between removal or <br />survival of vegetation type, age, and elevation with respect to <br />hvrlraidir catiimant trancnnrt anti hats rhanna variahlag) <br />7 Lateral/Vertical vegetation removal processes - develop data <br />collection protocol (methods, locations, timina. analvsis <br />8 Lateral/Vertical vegetation removal processes - field data <br />collection /observation (aerial photograhy, observation <br />documented photographically, hydraulic, bed material, sediment <br />trancnnrt anti hari /hank tnnnnranhir. rhnnnal <br />9 Lateral/Vertical vegetation removal processes - analysis <br />(comparison of aerial photographs /erosion pins, evaluation of <br />observations. development of relationships between hvdraulic_ <br />sediment transport, bed /bank material, bank geometry with age <br />and tvpe of veaetation removal) <br />10 Laboratory tests - develop protocol (laboratory and analysis <br />approach <br />11 Laboratory tests - conduct tests (outdoor flume with live <br />veaetation) <br />12 Laboratory tests - analysis (develop relationships between <br />hydraulic, sediment transport, bed change and age and type of <br />veoetation) <br />Rate <br />6 /day) <br />6001 <br />800 <br />600 <br />600 <br />E :10I11 <br />600 <br />600 <br />800 <br />600 <br />600 <br />•11 <br />•lI <br />Year 1 <br />5 <br />15 <br />5 <br />10 <br />15 <br />10 <br />10 <br />Staff C <br />Year 2 Year 3 <br />15 15 <br />5 5 <br />15 15 <br />10 10 <br />ay— <br />Year 4 <br />15 <br />5 <br />Yrs 5 -13 <br />5 <br />135 <br />45 <br />5 <br />15 45 <br />10 30 <br />5 <br />30 <br />20 <br />10 <br />10 <br />20 <br />10 <br />5 <br />5 <br />10 <br />40 <br />40 <br />20 <br />4C <br />2C <br />40 <br />20 <br />Totals <br />0 <br />10 <br />195 <br />65 <br />15 <br />Labor <br />Cost <br />I <br />$8,OC <br />$117,OC <br />$39,OC <br />$12,OC <br />105 $63,000! <br />70 $42,000 <br />15 $12,000 <br />70 $42,000 <br />40 $24,000 <br />10 <br />160 <br />60 <br />$8,000 <br />$96,000 <br />$36,000 <br />