Laserfiche WebLink
Changes in the River (continued) <br />Factor <br />Pre- Develop. <br />Current <br />Sediment load <br />7.8 million <br />1 million tons <br />tons <br />Channel width <br />1 -2 miles <br />1260 feet <br />(850 feet) <br />Riparian <br />10% of <br />72-91% of <br />vegetation <br />channel <br />channel <br />(Conceptual Analysis) <br />Theories <br />—Peak flow <br />— Desiccation <br />— Germination flows <br />— Sediment transport <br />—Ice scour <br />— Channel structures <br />Z, <br />