My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Final Environmental Impact Statement Volume I, Main Text and Appendices A-J
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Final Environmental Impact Statement Volume I, Main Text and Appendices A-J
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2013 4:17:34 PM
Creation date
2/27/2013 2:01:36 PM
Metadata
Fields
Template:
Water Supply Protection
Description
related to the Platte River Endangered Species Partnership (aka Platte River Recovery Implementation Program or PRRIP)
State
NE
Basin
South Platte
Water Division
1
Date
7/1/1998
Author
Federal Energy Regulatory Commission (FERC) Office of Hydropower Licensing
Title
Final Environmental Impact Statement (EIS) - Volume I, Main Text and Appendices A-J - Kingsley Dam (FERC Project No. 1417) and North Platte/Keystone Dam (FERC Project No. 1835) Projects, Nebraska, FERC/FEIS-0063
Water Supply Pro - Doc Type
EIS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
713
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. INTRODUCTION <br />1.1 PURPOSE AND NEED FOR ACTION <br />Pending before the Federal Energy Regulatory Commission (Commission) are two license <br />applications for projects in south - central Nebraska. One is an application filed by Central <br />Nebraska Public Power and Irrigation District (Central) for a new license for the Kingsley <br />Dam Project (Federal Energy Regulatory Commission [FERC] No. 1417). The second <br />application, filed by Nebraska Public Power District (NPPD), is for a new license for the <br />North Platte /Keystone Diversion Dam Project (FERC No. 1835). The two projects are <br />located near the confluence of the North and South Platte rivers, and they are jointly <br />operated for irrigation and power production. <br />1.2 HISTORY OF THE PROCEEDINGS <br />On June 21, 1984, Central and NPPD (the Districts) filed applications for new licenses for <br />their respective projects. On December 7, 1984, the Director of the Office of Hydropower <br />Licensing (Director) notified the licensees that their new license applications were deficient <br />and gave them 90 days to correct the deficiencies. The licensees responded to the Director's <br />letter on March 7, 1985, correcting some of the deficiencies and requesting an extension of <br />time to submit the remaining information. The Commission granted the extension and <br />established a new deadline of May 5, 1990. The Districts jointly filed the additional <br />information on May 4, 1990, and on June 27, 1990, the Commission staff issued a notice of <br />application acceptance. <br />Pursuant to Section 15(a) of the Federal Power Act (FPA) 16 U.S.C. Section 808(a), the <br />Commission is required to issue, from year to year, an annual license under the terms and <br />conditions of the existing license, until a new license is issued or the project is otherwise <br />disposed of in one of the ways set forth in Section 15. The licenses for Project Nos. 1417 <br />and 1835 expired on June 16 and June 30, 1987, respectively. On June 23, 1987, the <br />Commission issued annual licenses for Project Nos. 1417 and 1835, subject to the terms and <br />conditions of the original licenses, as required by Section 15(a) of the FPA. On <br />February 14, 1990, the Commission imposed interim resource protection and enhancement <br />measures on NPPD's Project No. 1835. The Commission also found that it lacked reserved <br />authority to amend Central's license unilaterally, but strongly encouraged Central's <br />cooperation with NPPD in implementing those measures. The Commission later stayed the <br />minimum flow requirements of NPPD's license because Central determined it could not <br />cooperate with NPPD, and compliance was impossible absent Central's cooperation. <br />Central then filed a license amendment request, and on July 16, 1991, the Commission <br />amended Central's annual license to incorporate target instream flows and other resource <br />protection measures. <br />1 -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.