My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Missouri River Planning Recommendations
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Missouri River Planning Recommendations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2013 1:32:20 PM
Creation date
2/27/2013 10:26:12 AM
Metadata
Fields
Template:
Water Supply Protection
State
MO
Date
4/1/1998
Author
Missouri River Basin Association
Title
Missouri River Planning Recommendations
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Plan' ning Process Summar__yl <br />The foll owing document planning effort in 1995. They people attended the conference, <br />�`v summarizes the recommelida- hired facilitators from The River aind -the participants produced <br />tioris developed by the :Missouri Group to help them design a -, nearly 80 pages of recommenda= <br />`Inver Basin Association after an process thaf would lead to a tions for MRBA's consideration. _ <br />extensive planning effort over consensus on at least certain. The MRBA Directors spent several <br />the past twa river operating months reviewing results of the <br />o years that utilized elements of- <br />input from citizens throughout plan. Bismarck conference. <br />the basin. <br />The MRBA Directors agreed Then, during the spring of <br />The Missouri River Basin on several issues early in the 1997, the;MRBA Executive <br />Association (MRBA) is a coati- -process. One point of agree- Director met with ad, hoc:com- <br />'tion of the basin's states and : mend was that the basin'needed Fnittees representing the follow- - <br />Indian tribes: The tribes are to hive in place an extensive ing five interests in the river: <br />represented in the Association environmental monitoring navigation; "recreation; fish and <br />by the Executive Director of the program. The Association asked - wildlife concerns; bank stabiliza- - <br />Mni Sose Tribal. Water Rights the Missouri River Natural tion and agriculture; and munici= <br />Coalition. The states parA6pate Resources Committee -to de pal and industrial water supply. <br />through agovernor- appointed velop a'draft monitoring pro - The MRBA Directors felt that the <br />_representative from each of the gram for the basin; -that docu- hydropower recommendations <br />following states: Iowa, Kansas, ment has been drafted and is that came from the June 1996 <br />IV�issouri, Montana, Nebraska, . available "for comment. Bismarck Conference did not ' <br />North Dakota, South Dakota, need elaboration, so there was - <br />and Wyoming. <br />The Directors also agreed no follow -up meeting with the <br />that the Corps and other agen -- hydropower committee: <br />In 1994, the Corps of Engi- cies`need to involve the basins <br />neers . (Corp) published the Indian tribes to a greater degree,. After working through the': <br />results of extended review of in planning` activities. Bismarck Conference and the <br />the Master Water Control following committees' sugges <br />Manual for the Missouri River- Finally, the Directors agreed tions; the MRBA Directors , <br />(Master Maritial). In the docu- that the spring rise (an increase drafted a set of recommenda " <br />men #, the Corps recommended in springtime reservoir releases tions that was the focus of a <br />several changes in the way it to simulate the flows that second MRBA - sponsored. <br />managed the river. Some of the - .existed before the dams-were - basinwide event, this one held in, <br />changes were controversial, and built) proposed by the Corps is . Kansas City in N ovember 1997.; <br />the document failed to achieve not the best method for ad- <br />public approval. dressing habitat concerns. ' The MRBA - Directors used yM. <br />input from the Kansas City sn <br />The MRBA,Direetors (or a Conference to develop the - <br />hate that year, the -Corps g - . <br />asked the MRBA Directors to " . nized a basmwide conference in . document that "follows: Readers <br />develop elements of a Missouri Bismarck, North Dakota in June should note that in the months <br />River operating plan that. would 1996, to solicit feedback from. that follow, the MRBA Directors <br />meet with broader In - people who would be affected will also develop recommenda <br />response, the Directors of the by any plan for the Missouri fons on drought - flows for the , <br />Association began an .extensive River. Approximately 120 river system. <br />Z ti . <br />
The URL can be used to link to this page
Your browser does not support the video tag.