Laserfiche WebLink
TABLE 2 <br />Xa7Arr u rnVQ uvAT7nN TMPT.F.MF,NTATION SCENARIOS <br />Scenario <br />Total I &R Cost <br />Total O &M Cost <br />40 -Yr Fully Developed <br />(x $1,000) <br />(x $1,000) <br />Diversion Reduction <br />(af /yr) <br />Canal Lining Only <br />10.375 <br />0 <br />45,168 <br />Canal Lining and <br />Groundwater <br />4.862 <br />5.513 <br />43,303 <br />40 -Year Scheduling, <br />Canal Lining, and <br />Groundwater <br />4.164 <br />6.211 <br />34,873 <br />10 -Year Scheduling, <br />Canal Lining, and <br />Groundwater <br />4.062 <br />6.313 <br />35,077 <br />' Detailed breakdowns of each of the scenario's cost estimates and diversion reduction quantities <br />are provided in Tables 3 -6 on the following pages. <br />F- <br />L <br />