My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Volume III: Apendices B-T Of the Biological Opinion
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Volume III: Apendices B-T Of the Biological Opinion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2013 3:46:59 PM
Creation date
2/25/2013 3:34:21 PM
Metadata
Fields
Template:
Water Supply Protection
Description
related to the Platte River Endangered Species Partnership (aka Platte River Recovery Implementation Program or PRRIP)
State
NE
Basin
North Platte
Date
7/1/1997
Author
U.S. Fish and Wildlife Service, Grand Island, Nebraska
Title
Volume III: Appendices B - T of the Biological Opinion (BO) on the Federal Engergy Regulatory Commission's (FERC) Preferred Alternative for the Kinglsey Dam Project (No. 1417) and the Northe Platte/Keystone Dam Project (No 1835) (PROJECT NO. 1835)
Water Supply Pro - Doc Type
Biological Opinion
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE 1 <br />WATER CONSERVATION MEASURE UNIT COST ESTIMATES <br />Measure <br />Installation <br />Cost <br />(I) <br />Replacement <br />Cost <br />(R) <br />Combined <br />I &R Cost <br />Savings <br />(af /yr) <br />I &R Unit <br />Cost <br />($ /af /yr) <br />O &M Cost <br />($ /af /yr) <br />Canal Lining <br />459,400 <br />0 <br />459,000 <br />2,000 <br />230 <br />0 <br />Groundwater <br />62,300 <br />124,600 <br />186,900 <br />12,000 <br />16 <br />7 <br />Scheduling <br />1 60,000 <br />180,000 <br />240,000 <br />5,775 <br />42 <br />14 <br />All cost estimates are in constant dollars and are not adjusted for inflation. <br />The economic evaluation performed considers various implementation scenarios comprised of <br />combinations of one or more of these measures. The evaluation is based on the proposed <br />water conservation implementation schedule included in Appendix E (Table E -3, page E -5) of <br />the 1995 BA. <br />The water conservation implementation schedule summarized in the 1995 BA Appendix <br />identifies dollar amounts for water conservation implementation for each year of the 40 year <br />license period. Based on this schedule, planning activities would occur during the first three <br />years, and actual implementation would not begin until the fourth year. The schedule specifies <br />$500,000 would be spent annually during years 4 -15, and $175,000 would be spent annually <br />for the remaining years 16-40. For the purpose of this discussion, it is assumed these amounts <br />include the cost of initial installation, replacement, and annual operation and maintenance costs <br />associated with implementation of water conservation measures. <br />Implementation Scenarios <br />Four scenarios have been identified which include one or more of the above measures. The <br />scenarios have been developed and evaluated within the constraints of the implementation <br />schedule of the 1996 BA Appendix. The primary constraint associated with the schedule is <br />that total operation'and maintenance costs are limited at $175,000 (at 1996 cost) beyond year <br />15. <br />The scenarios include canal lining only, canal lining and groundwater pumping, and two <br />scenarios which include canal lining, groundwater pumping, and scheduling modifications. <br />One of the two latter scenarios include scheduling modifications for only the first ten years, <br />and the second with scheduling modifications for the full 40 years. Estimated annual diversion <br />reductions at 40 year full development under each of these scenarios are summarized in Table <br />2 below. <br />r <br />1 <br />r <br />n <br />n <br />
The URL can be used to link to this page
Your browser does not support the video tag.