My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Feasibility Study, Enlargement of Julesburg Reservoir
CWCB
>
Water Supply Protection
>
DayForward
>
8001-9000
>
Feasibility Study, Enlargement of Julesburg Reservoir
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2013 11:46:28 AM
Creation date
2/20/2013 11:10:02 AM
Metadata
Fields
Template:
Water Supply Protection
Description
Logan and Sedwick Counties, Colorado
State
CO
Date
3/6/1998
Author
Narender Kumar & James Ferentchak
Water Supply Pro - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-21- <br />10.2 Tec' ,nical Feasibility <br />• Perform a detailed geologic and geotechnical reconnaissance of the dam sites to <br />assess construction conditions, foundations, borrow area locations and availability <br />of materials, and potential unanticipated site conditions. <br />• Re- evaluate project alternatives and identify the preferred plan for project <br />development based on additional financial and environmental considerations. <br />• Assess project staging opportunities. <br />• Evaluate need for county road relocations, and acquisition /lease /easement of land for <br />roads, borrow areas and construction. <br />10.3 Environmental Feasibility <br />• Define the purpose and need for the project. !d 0 <br />• Formulate positive environmental impacts and uses for the project. <br />• Assess the wetlands atthe' project site and evaluate potential impacts. <br />• Perform an environmental analysis of alternatives. Characterize major differences <br />among the alternatives in terms of environmental impacts and mitigation <br />requirements. <br />10.4 Political Considerations <br />• Assess the political will and muscle available to facilitate the project approval given <br />the possible significant contribution to the lower Platte River endangered species <br />issues, and :the minor to significant adverse local environmental impact of the project. <br />NK /ck <br />cc: file, book <br />2 \reports \97- 1- 500.nk <br />
The URL can be used to link to this page
Your browser does not support the video tag.