Laserfiche WebLink
-10- <br />subject to erosion. These concerns can be alleviated by grouting the permeable portion of the <br />bedrock, by replacing the permeable bedrock with compacted impervious fill, or by <br />constructing a slurry trench cutoff. The selected cutoff is the most practical method for <br />rehabilitation of the existing embankments given the in -situ conditions and the cost <br />implications. The slurry trench should be constructed into the unweathered portion of bedrock. <br />3.3.3 Slope Stability <br />Recent stability studies were performed on the relatively; steep uup °s"tream slopes of Dam 2 and <br />Dam 3. The analyses indicate that in event of rapid drawdown exceeding 5 feet, the upstream <br />slopes will have an inadequate factor of safety. Therefore,,flattening of the upstream slopes <br />of Dams 2 and 3 should also be part of the rehabilitation. <br />4.0 DESIGN PARAMETERS <br />4.1 General <br />The proposed rehabilitation and enlargement project would -involve three general alternatives. <br />These include: <br />• Stabilization of Dam 1 to a condition equivalent to the current condition of the <br />remaining facility and/or, rehabilitate the existing dams and foundations to current <br />day ;standards to the extent, reasonably possible, storing water at the normal <br />operating level of Gage 24.0. <br />• Rehabilitate and /or`reconstruct the existing dams to meet current dam design criteria <br />to the extent reasonably possible and increase the normal operation level by 3.5. <br />• Rehabilitate and /or reconstruct the existing dams or construct new dams to enlarge <br />the reservoir and increase the normal operation level by 6.5 feet. <br />4.2 Hydrologic and Hydraulic <br />4.2.1 Freeboard <br />The dam freeboard provided for wave height, wave runup and flood surcharge storage should <br />be 8.0 feet. The addition of a 3 -foot high parapet wall for additional wave protection is <br />PrePorts \97- 1- 500.nk <br />