Laserfiche WebLink
CU -South Boulder Creek Floodp ain <br />Review <br />2 Flood lain Identification <br />Performance Project Description <br />Four Mile Creek, Canon City, <br />Colorado <br />Frenchman Creek floodplain revision <br />Los Pinos FPI w /Corps and La Plata <br />Douglas Wash FPI w/NRCS and <br />Mesa County <br />Post - Wildfire field inspection, hazard <br />ID, and floodplain mapping <br />Eagle River floodplain study <br />Gunnison County Tributary FPI <br />w /Corps and Gunnison County <br />Town of Basalt floodplain mapping <br />Town of Otis floodplain sruay <br />Bosley Wash FPI w /Consultant, <br />Mesa County, and Grand Junction <br />Drainage Dist. <br />Individual FEMA Map <br />Modernization Studies <br />Map Modernization <br />Map Modernization <br />database of floodplain engineering <br />information, track resolutions, <br />assist PM, and perform day - <br />forward imaging <br />Provide CWCB perspective IPO <br />regarding the designated 100- year <br />Performance Measure I Priority <br />Complete FPI study and <br />recommend for designation <br />Prepare draft report and secure <br />community endorsement <br />Complete contracted study and <br />recommend for designation <br />Meet w /locals to formulate a new <br />study proposal for the NRCS FPI <br />Work with study partners to <br />identify post - wildfire hazards and <br />distribute information <br />electronically (Missionary Ridge, <br />rmain l Seam, Ha an, Million <br />floodplain study with <br />tant and Eagle County; <br />in project schedule; manage <br />conversion by FEMA of draft <br />study by Sato for Eagle River and <br />by Matrix for Roaring Fork River <br />Contract for topographic and <br />digital base mapping; complete <br />hydrology; and maintain project <br />schedule <br />Complete floodplain study and <br />related informational documents, <br />as listed in scope of work between <br />town and CWCB; manage <br />conversion by FEMA of draft <br />study by Sato for Eagle River and <br />by Matrix for Roarin Fork River <br />Complete contracted study <br />Complete contracted study and <br />recommend for designation and <br />select demonstration project <br />1' • <br />M <br />1' • <br />Complete first year mapping work <br />for City and County of Denver, <br />contingent on Congressional <br />approval of funding <br />Complete first year mapping work <br />for southern Douglas County, <br />1' • <br />1' • <br />I' • <br />1' • <br />1' • <br />CWCB <br />meeting <br />Larry As required <br />Project I Completion <br />Mana er <br />Date <br />Tom <br />12 -31 -04 <br />Tom <br />Completed <br />Tom <br />12 -31 -04 <br />! Tom Hold <br />Tom On -Going <br />Brian 14-30-03 <br />Brian 6 -30 -03 <br />Brian 6 -30 -03 <br />Brian <br />12 -31 -03 <br />Larry <br />6 -30 -04 <br />Brian <br />4 -30 -04 <br />Brian 4 -30 -04 <br />(Tom to <br />5 <br />