Laserfiche WebLink
Consultant Selection Process <br />Pursuant to Sections 24 -30 -1401 through 1408, CRS, notice is hereby given that the <br />CWCB may retain engineering services to contract for a reconnaissance level study of <br />water management and storage options. The CWCB is required by statute to conduct a <br />consultant selection process. The selection process will include the following steps: <br />1. Request Statement of Qualifications (SOQ) for interested firms. <br />2. Evaluate and rank the SOQ's. <br />3. Conduct interviews with the top three (3) ranked firms. <br />4. Rank the firms based on their SOQ and interviews. <br />5. Enter scope of work and contract negotiations with the highest ranked firm. If a <br />satisfactory contract can not be negotiated, enter into scope of work and contract <br />negotiations sequentially with the second and third ranked firm. <br />The firm selected for the reconnaissance study may be selected to conduct feasibility <br />study, design, and construction management if warranted (based on project merit, firm <br />performance and cost) and funded by CWCB and the legislature. <br />3 <br />