Laserfiche WebLink
Categorization of JMR Accounting Issues <br />Issue <br />Number <br />Issue <br />L i <br />2 <br />P <br />T s <br />KS Staff position <br />CO Staff Position <br />KS Staff Comment <br />CO Staff Comment <br />Operations Committee or other <br />general Comment(s) <br />52 <br />Upstream storage <br />Upstream storage is not <br />1980 Operating Plan not <br />Discontinue the practice <br />Cbinpact not intended to <br />Unresolved <br />during JMR spill <br />in priority until Section <br />intended to address <br />until authorized by,, <br />impair, use of water by <br />events <br />II accounts is <br />issues other than JMR <br />resolution of ARCA. <br />either s "I if ' no <br />completely spilled. <br />conservation pool <br />material depletion to <br />operations and therefore <br />useable :stateline flows <br />provides no guidance on <br />results. Apportioning <br />upstream storage when <br />water during flood <br />JMR spilling <br />operations may be a <br />Compact issue for <br />a <br />negotiation by ARCA, <br />but is clearly not a 1980 <br />Operating Plan issue to <br />be determined by the <br />Operations Committee. <br />See earlier exchange of <br />letters between Mr. <br />Simpson and Mr. Pope <br />on this issue. <br />53 <br />Adjusted JMR <br />The 1980 Operating <br />Discontinue the practice <br />Unresolved <br />inflows during <br />Plan does not provide,: <br />until authorized by <br />times of spill <br />for these adjustments: ". , <br />resolution of ARCA. <br />° <br />a <br />*Only can be resolved if <br />52 is resolved <br />2002issues table09. doc Joint work product — 24 October 2003 Draft Issues Table — For discussion purposes only <br />