My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Special Report of the Operations Secretary
CWCB
>
Publications
>
DayForward
>
Special Report of the Operations Secretary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2013 1:44:11 PM
Creation date
2/6/2013 2:46:44 PM
Metadata
Fields
Template:
Publications
Year
2003
Title
Special Report of the Operations Secretary
Author
Arkansas River Compact Adminstration
Description
Concerning processes to resolve administrative issues, the status of issues, and a proposal to alternate the offices of operations secretary and assistant operations secretary 12/8/2003
Publications - Doc Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Categorization of JMR Accmintinsr TccrnPc <br />Issue <br />r <br />z <br />3 <br />Operations Committee or other <br />Number <br />Issue <br />L <br />P <br />T <br />KS Staff position <br />CO Staff Position <br />KS Staff Continent <br />CO Staff Comment <br />general Comment(s) <br />5D <br />Commencement of <br />The language places the <br />Contrary to express <br />Rely on the physicall <br />, Kansas' ignores <br />Unresolved <br />a spill event <br />event on the physical <br />language of 1980 <br />operations of the project <br />Coi}rs o %.,Engineers <br />operation of the projects <br />Operating Plan, water <br />control structure to <br />exclusye;authority to <br />control structure and not <br />does not "spill <br />govern the loss'of <br />determine flood control <br />on the elevation of the <br />physically over the <br />account water. No <br />releases when JMR <br />awater <br />surface or some <br />project's spillway" <br />changeto the language <br />surface elevation rises <br />other trigger. <br />during flood operations. <br />is re.qurred, unless <br />into flood pool space. <br />Colorado's timing of <br />Flood releases are <br />clan ing Language is <br />spill accounting is not <br />normally made through <br />desired <br />suggested in the <br />the outlet works. <br />governing language. <br />51 <br />Spilling accounts <br />The accounting <br />Accounting based on <br />Clse the:nornal <br />Use inflow based <br />Unresolved <br />practices should not <br />JMR inflows is used at . <br />accounting methods <br />accounting at all times <br />change during a spill <br />all other times and;has' <br />during spills that occurs <br />event. Accounts are <br />been demonstrated to <br />at all other times. This <br />adjusted as dictated by <br />produce identical results <br />also eliminates the issue <br />the physical operation of <br />as putflow based <br />of how to handle <br />o <br />the dam. A flood pool <br />accounting. <br />evaporation during a <br />a <br />account in the flood <br />spill event. Tracking the <br />control space is xot .!" <br />extent that water invades <br />authorized bythc 19.90`::, <br />the flood control storage <br />Operating Plan and <br />space prior to release by <br />creates eyaporation <br />the Army Corps of <br />charge conflicts. <br />Engineers is useful. <br />2002issues table09.doe Joint work product — 24 October 2003 Draft Issues Table — For discussion purposes only <br />
The URL can be used to link to this page
Your browser does not support the video tag.