Laserfiche WebLink
The staffs did discuss rotating the duties of the Operation Secretary between the respective <br />States. There was no direct work product that could be associated with these discussions. <br />Steve Miller, CWCB, did present a proposal for permanent pool evaporation and an <br />additional water source for the permanent pool and other Colorado Division of Wildlife projects <br />along the Arkansas River mainstem. Those discussions will be reviewed with David rope, the <br />Kansas ARCA Commissioner who sits on the ARCA Engineering. Committee. <br />cc: Mark Rude <br />Steve Witte <br />David Pope <br />Steve Miller <br />October 2003 Work Product <br />Page 3 of 3 <br />Revision Date: 31 October 2003 (9:24 am) <br />Last printed 11/1312003 5:57 PM <br />