My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado River Return Project
CWCB
>
Publications
>
DayForward
>
Colorado River Return Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2013 2:57:41 PM
Creation date
2/6/2013 11:59:09 AM
Metadata
Fields
Template:
Publications
Year
2002
Title
Colordao River Return Project
Author
Boyle Engineering Corporation
Description
Colorado River Return Project
Publications - Doc Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 <br />Ask <br />38 <br />Project Name <br />Tunnel <br />Length <br />Diameter <br />(ft) <br />PG &E - Bear River Canal, Tunnel <br />0.5 <br />4.5 <br />PG &E - Crane, Ditch 3, Tunnel 2 <br />0.04 <br />4.5 <br />PG &E - Middle Fork <br />0.2 <br />8 <br />PG &E - Wise Canal, Tunnels 7, 8 <br />0.1 <br />4.5 <br />Regional Wastewater Service Plan <br />NA <br />NA <br />Rickenbacker Sewer <br />9.6 <br />14 <br />San Vicente Pipeline <br />13 <br />8.5 <br />Second Mana ouri Tailrace Tunnel <br />6.5 <br />33 <br />BWI Storm Drainage Tunnel, Pier A Terminal <br />Expansion <br />0.15 <br />6 <br />Lower Northwest Interceptor <br />1.5 <br />10 <br />SRCSD Interceptor Design Manual <br />NA <br />NA <br />A -Canal Tunnel Rehab <br />0.6 <br />25 <br />Hart Street Forcemain Replacement <br />1 <br />3 -4 <br />Northern Alignment Geologic Study <br />42 <br />15 <br />Pacoima Dam Sloillway Mods. <br />0.1 <br />24 <br />Pleasant Hill Relief Interceptor <br />6 <br />6.5 <br />Riverside Badlands Tunnel <br />8 <br />12 <br />Tanner Creek Stream Diversion <br />0.9 <br />6 <br />Caldecott Tunnel <br />0.8 <br />60 <br />Dallas Riverfront Tunnel <br />0.1 <br />12 <br />Cape Creek Tunnel <br />0.1 <br />30 <br />Nimitz Highway Reconstructed Sewer <br />2 <br />5 <br />Salt Creek Tunnel <br />0.2 <br />32 <br />Sunset Tunnel <br />0.2 <br />32 <br />Upper Diamond Fork <br />2.7 <br />9.5 <br />Arch Cape Tunnel <br />0.2 <br />30 <br />Eastside Reservoir Southern California <br />4 <br />15 <br />Los Vaqueros Diversion Tunnel <br />0.2 <br />7 <br />Mosier Twin Tunnels <br />0.1 <br />24 <br />South Bay Ocean Outfall <br />3.6 <br />13 <br />Bradshaw Interceptor <br />1.8 <br />9 <br />Enerco Natural Gas Pipeline <br />0.5 <br />1 <br />Kern River No. 3 Rehabilitation <br />8.4 <br />8.5 <br />Richmond Transport Tunnel <br />2 <br />14 <br />Devil's Slide Tunnel Study <br />0.9 <br />74 <br />Matahina Seismic Improvement <br />0.2 <br />22 <br />Nimitz Highway Relief Sewer <br />1 <br />4.5 <br />North Metro Interceptor <br />0.75 <br />9 <br />Tijuana River Crossing <br />0.3 <br />1 <br />Columbia Slough Consolidation Conduit <br />5 <br />9 <br />Dearborn CSO Tunnel <br />6.5 <br />20 <br />Homer Tunnel <br />2 <br />24 <br />Getty Drainage Tunnel <br />0.1 <br />10 <br />West Leg Interceptor <br />7 <br />7.5 <br />Elk Creek Tunnel <br />0.2 <br />26 <br />Goodwin Tunnel <br />3.5 <br />14 <br />Hanging Lake Tunnels <br />0.9 <br />42 <br />Cowles Mountain Tunnel <br />1.3 <br />8 <br />Forks of Butte <br />2.3 <br />11 <br />38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.