My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado Water Resources & Power Development Authority Jan 2003
CWCB
>
Publications
>
DayForward
>
Colorado Water Resources & Power Development Authority Jan 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2013 1:22:03 PM
Creation date
2/6/2013 11:35:49 AM
Metadata
Fields
Template:
Publications
Year
2003
Title
Board of Directors Meeting
Author
Colorado Water Resoures & Power Development Authority
Description
Board of Director Meeting Jan 24, 2003
Publications - Doc Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
/ C� <br />SECOND AMENDMENT TO MEMORANDUM OF UNDERSTANDING <br />• SOURCE WATER ASSESSMENT AND PROTECTION PROGRAM SET -ASIDE <br />RFP No. SWP -SA -001 <br />This Second Amendment to the Memorandum of Understanding ( "MOU ") is entered into as of January 24, 2003 <br />by and among EnecoTech Inc. (the "Contractor ") and the Colorado Water Resources and Development Power <br />Authority (the "Authority ") and the Colorado Department of Public Health and Environment, Water Quality <br />Control Division (the "WQCD ") (each a "Party" and collectively the "Parties ") to set forth their agreement <br />concerning the Contractor's provision of services in connection with the Colorado Source Water Assessment and <br />Protection ( "SWAP ") Program. <br />1. RECITALS <br />1.1 A Memorandum of Understanding ( "MOU"), dated as of October 1, 2001, was entered by <br />Hydrosphere Resource Consultants (the "Former Contractor "), the Authority and the WQCD for the provision of <br />certain services by the Former Contractor in connection with (1) developing a Data Analysis Toolset to aid the <br />susceptibility analysis, (2) conducting susceptibility analyses and (3) generating source water assessment reports for <br />surface water -based public water systems, and ground water systems under the influence of surface water, as set <br />forth in the approved revised SWAP Work Plan utilizing SWAP set -aside funds. <br />1.2 An Assignment of MOU Rights and Termination of Subcontract ( "Assignment ") agreement, dated <br />June 14, 2002, was entered by the Former Contractor, the Contractor, the Authority and the WQCD allowing the <br />Former Contractor to assign, transfer and set over its future rights, title, obligations, and interest in and to the <br />• Memorandum of Understanding to the Contractor for the continued provision of certain services by the Contractor <br />in connection with (1) developing a Data Analysis Toolset to aid the susceptibility an (2) conducting <br />susceptibility analyses and (3) generating source water assessment reports for surface water -based public water <br />systems, and ground water systems under the influence of surface water. <br />1.3 As a result of the Assignment, the Parties determined that modifications to the original scope of <br />work and schedule were needed (First Amendment to.the Memorandum of Understanding) to enable the completion <br />of a quality Data Analysis Toolset, and quality susceptibility analyses and source water assessment reports for <br />surface water -based public water systems and ground water systems under the influence of surface water. <br />1.4 The amended scope of work detailed the preliminary design of the Toolset through the Preliminary <br />Design Review (PDR) task and also allowed for future work on the project to be re- scoped at the end of the PDR <br />task to the budget available to address the WQCD's highest priorities. <br />1.5 Accordingly, with the completion of the PDR task as determined by the WQCD, the Parties have <br />decided to enter into this Second Amendment to the Memorandum of Understanding to reflect the revised scope of <br />work and schedule. <br />1.6 The Contractor and WQCD have complied with any additional procurement requirements <br />necessitated by the revisions to the Memorandum of Understanding and scope of work. <br />2. AGREEMENT <br />2.1 Amended Scope of Work. The scope of work attached to the August 23, 2002 First Amendment <br />to the Memorandum of Understanding shall be and hereby is replaced by the Amended Scope of Work attached <br />. hereto as Exhibit A. <br />Second Amendment SA SWAP MOU -final 01/16/03 Page 1 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.