My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reconnaissance-Level Water Action Plan
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Reconnaissance-Level Water Action Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2013 3:46:56 PM
Creation date
1/30/2013 3:15:07 PM
Metadata
Fields
Template:
Water Supply Protection
Description
for the Governance Committee of the Cooperative Agreement for Platte River Research (aka Platte River Recovery Implementation Program or PRRIP)
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
9/14/2000
Author
Boyle Engineering Corporation in association with BBC Research & Consulting andAnderson Consulting Engineers
Title
Platte River Research Cooperative Agreement Reconnaissance-Level Water Action Plan
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
future or potentially existing downstream users if they are not protected through the water <br />rights administration process. Storage releases and return flows from reservoir seepage <br />will also alter the quantity and timing of water available to downstream users. Reservoir <br />seepage is a particular concern due to existing seepage problems in the Plum Creek <br />drainage for example. Additional seepage may increase groundwater levels in the <br />vicinity, which could have both positive and negative third party impacts. Increased <br />groundwater levels could reduce pumping costs for nearby groundwater irrigators. <br />Alternatively, increased groundwater levels could result in waterlogging of nearby <br />irrigated lands causing decreased productivity and yields. <br />A re- regulating reservoir could generate employment opportunities on a short-term basis <br />during construction, which is a third party economic benefit. A re- regulating reservoir <br />should not impact crop patterns or crop production, in which case regional changes in <br />income, sales, or tax revenues are not likely. <br />A CNPPID re- regulating reservoir could provide an increase in recreational <br />opportunities, which is a third party benefit. Recreational opportunities may include <br />swimming, picnicking, fishing, nature study, sightseeing, hiking, and boating. The extent <br />to which recreational opportunities are enhanced depends on how the reservoir is <br />operated and whether the other reservoirs in the vicinity, including Johnson Lake and <br />Elwood Reservoir, already provide similar recreational opportunities. <br />Third party environmental impacts associated with this project can be both positive and <br />negative. There could be negative impacts to wetlands from reservoir impoundment and <br />positive impacts resulting from the creation of additional wildlife habitat. Reservoir <br />projects could also have both negative and positive impacts on water quality and <br />downstream aquatic habitat. Water quality could improve during the summer months <br />when additional flows are added to the river. However, water quality could be degraded <br />and fish and aquatic habitat negatively impacted during the winter months when river <br />flows are reduced. This possibility might be minimized if water is only pumped when <br />target flows are being met. <br />2. WATER LEASING IN NEBRASKA <br />0 Location: <br />Nebraska has not yet identified specific irrigation districts or individual farmers that are <br />willing to participate in a leasing program in conjunction with the Program. The <br />willingness to participate is also unknown at this time. 'Due to these conditions, a leasing <br />program was evaluated for Reaches 10 (Julesburg, CO gage to South Platte at North <br />Platte, NE gage) and 14 through 19 (Keystone Diversion gage to Grand Island, NE gage). <br />It was assumed that representative leasing projects are located at the mid point of each <br />reach because specific irrigation districts and lands willing to participate in the <br />Program are not yet known. The reaches are defined as follows: <br />Reach 10: Julesburg, CO gage to South Platte at North Platte, NE gage <br />Reach 14: Keystone Diversion gage to North Platte at North Platte, NE gage <br />Reach 15: North Platte at North Platte, NE, gage to Brady, NE gage <br />Reach 16: Brady, NE gage to Cozad, NE gage <br />Reach 17: Cozad, NE gage to Overton, NE gage <br />Reach 18: Overton, NE gage to Odessa, NE gage <br />\ \DN00 \E- DRIVE\ PROJECTS\ Platte \Work Products\Task 9 \wapc report (Version 7).doc - 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.