My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GC 2010 PRRIP
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
GC 2010 PRRIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2013 11:55:32 AM
Creation date
1/25/2013 4:59:45 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Platte River Recovery Implementation Program (PRRIP) Governance Committee (GC) Meeting agendas, contracts, emails, budgets, related reports, minutes, notes, etc. 2010
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
1/1/2010
Author
Platte River Recovery Implementation Program (PRRIP)
Title
Platte River Recovery Implementation Program (PRRIP) Governance Committee (GC) Meeting documents for 2010
Water Supply Pro - Doc Type
Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
W + <br />3. A report will be produced summarizing the methods and results of these <br />iinvestigations and providing sufficient detail to use in specification design. <br />4. The CNPPID staff, in cooperation with PRRIP staff, will conduct investigations <br />related to land or easement requirements, potential effects to landowners in the area of <br />the proposed project, and potential acceptance of the proposed project by area <br />landowners. In addition, CNPPID will provide input to other components of the <br />study. <br />5. CNPPID will provide up to $30,000 to assist the PRRIP with this feasibility study. <br />percent upon initiation of the study and fifty percent upon completion of the study. <br />Additional funds may be provided by CNPPID at its discretion. <br />6. The feasibility report will clearly define any proposed project (s). <br />D. Formal Contract <br />After completion of the feasibility investigations, and if the Governance Committee of the PRRIP <br />and the Board Directors of CNPPID agree that a particular proposed project may be feasible, a <br />formal contract between PRRIP and CNPPID will be developed before proceeding further. The <br />formal contract would define the entitlements, roles, and responsibilities of the PRRIP and <br />CNPPID during the completion and implementation of the particular proposed project. A formal <br />contract will need to be finalized and approved by the parties before PRRIP or CNPPID will <br />assume any responsibilities to pursue the particular proposed project beyond the feasibility study. <br />Neither PRRIP nor CNPPID are bound by this agreement to proceed any further than the <br />feasibility study described in this document. <br />E. Term of Agreement <br />The term of this agreement will begin when signed by the parties hereto and continue until the <br />completion of the feasibility study or March 30, 2011, whichever occurs sooner, unless extended <br />or terminated by mutual agreement of the parties. <br />Don Kraus <br />Date <br />General Manager, The Central Nebraska Public Power and Irrigation District <br />Jerry F. Kenny Date <br />Executive Director, Platte River Recovery Implementation Program <br />
The URL can be used to link to this page
Your browser does not support the video tag.