My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP Late 2007 to 2008
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
PRRIP Late 2007 to 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2013 11:37:57 AM
Creation date
1/25/2013 1:49:40 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Platte River Recovery Implementation Program (PRRIP) Various Documents from 2007 to 2008 including reports, studies, RFPs, proposals, budgets, Governance Committee (GC) meeting documents, and emails.
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
1/1/2007
Author
Platte River Recovery Implementation Program (PRRIP)
Title
Platte River Recovery Implementation Program (PRRIP) Various Documents from 2007 to 2008 and emails.
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
736
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />PRRIP — ED OFFICE FINAL <br />12/10/2007 <br />Prospective contractors should address their capability to comply with the above schedule. If <br />it is deemed that the above critical dates should be revised, prospective contractors should <br />offer alternative schedules describing the logic and reasons for the alternative. <br />3) Conflicts of Interest Statement addressing whether or not any potential conflict of interest <br />exists between this project and other past or on -going projects, including any projects <br />currently being conducted for the Program. <br />4) <br />Detailed cost not to exceed proposal to complete the project, separated into protocol <br />development and protocol implementation. The proposal should identify costs and hours <br />allocated for each task in the scope of work and the total cost for the study. Hourly rates and <br />reimbursable expenses for the proposing firm/individual and any sub - contractors must be <br />attached to the detailed price proposal. The contract will be awarded on a Cost Not to <br />Exceed basis. The initial contract will be for protocol development. Governance Committee <br />approval is needed before the contractor is authorized to begin protocol implementation. <br />5) List of relevant project experience within the past five (5) years, including name, location <br />and brief description of the projects; name, address and phone number of the contracting <br />officer for the client; and identification of key participants and their tasks on previous <br />projects who would also be working on this study. <br />• 6) Resumes of key participants and subcontractors proposed for this study. The resumes should <br />address experience on projects similar to this stage change study. Types of expertise that <br />may be appropriate include familiarity with pallid sturgeon biology and the key physical <br />parameters, river hydraulics and hydrology, the lower Platte River, and river monitoring and <br />research techniques. <br />7) Description of Insurance shall be provided with the proposal. Proof of insurance will be <br />required before a contract is issued. Minimum insurance requirements will include <br />$1,000,000 general liability per occurrence. To the extent authorized by law, the contractor <br />shall indemnify, save, and hold harmless the Nebraska Community Foundation; the states of <br />Colorado, Wyoming, and Nebraska; the Department of the Interior; members of the <br />Governance Committee; and the Program Executive Director's Office, their employees, <br />employers, and agents; against any and all claims, damages, liability, and court awards <br />including costs, expenses, and attorney fees incurred as a result of any act or omission by the <br />contractor or its employees, agents, subcontractors, or assignees pursuant to the terms of this <br />project. <br />8) A pre -bid meeting of interested parties will be held to address questions associated with this <br />Request for Proposals at a time and location that will be set by the Program's Executive <br />Director's Office. <br />Please submit one electronic copy of your proposal in PDF format by January 18, 2008 to <br />Chad Smith at smithc@headwaterscorp.com. <br />
The URL can be used to link to this page
Your browser does not support the video tag.