My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP Late 2007 to 2008
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
PRRIP Late 2007 to 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2013 11:37:57 AM
Creation date
1/25/2013 1:49:40 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Platte River Recovery Implementation Program (PRRIP) Various Documents from 2007 to 2008 including reports, studies, RFPs, proposals, budgets, Governance Committee (GC) meeting documents, and emails.
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
1/1/2007
Author
Platte River Recovery Implementation Program (PRRIP)
Title
Platte River Recovery Implementation Program (PRRIP) Various Documents from 2007 to 2008 and emails.
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
736
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PRRIP — ED OFFICE FINAL <br />12/10/2007 <br />S PLATTE RIVER RECOVERY IMPLEMENTATION PROGRAM <br />REQUEST FOR PROPOSALS <br />is <br />SUBJECT: Lower Platte River Stage Change Study <br />REQUEST DATE: December 10, 2007 <br />CLOSING DATE: January 18, 2008 <br />POINT OF CONTACT: Chad Smith — Executive Director's Office <br />Platte River Recovery Implementation Program <br />Lincoln, Nebraska 68516 <br />(402) 261 -3185 <br />smithc @headwaterscorp. com <br />RECITALS <br />The Governance Committee of the Platte River Recovery Implementation Program (Program) <br />submits this Request for Proposals (RFP) to solicit proposals from contractors to develop and <br />implement a protocol for a lower Platte River (Nebraska) stage change study. The protocol will <br />be used to define the final scope and budget for the stage change study, but proposals submitted <br />in response to this RFP need to provide enough detail on the overall project to convey an <br />understanding of the stage change study. The results of the study will serve as a tool for the <br />Governance Committee to assist in determining the effects of flow changes over time on river <br />stage and associated physical parameters thought to be of significance to pallid sturgeon <br />(Scaphirhynchus albus). <br />In responding to this RFP, the Governance Committee requests the following information: <br />1) Scope of work for completing this project. Prospective contractor should address the tasks <br />outlined herein. <br />2) Detailed schedule for completing each task in the preliminary scope. The following are the <br />critical dates for the Governance Committee's preferred schedule for the project: <br />February 15, 2008 <br />Protocol draft for Governance Committee review <br />March 31, 2008 <br />Final Protocol/ Notice to Proceed with Protocol Implementation <br />September 30, 2008 <br />Draft of First Progress Report on field work activities <br />December 31, 2008 <br />Draft of Second Progress Report on field work activities <br />July 30, 2009 <br />Complete field portions of study as defined in the Scope of Work <br />September 30, 2009 <br />Submit draft report and other materials for review <br />December 31, 2009 <br />Final Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.