My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Report on Estimated Cost for Expansion Tamarack Managed Groundwater recharge Project
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Report on Estimated Cost for Expansion Tamarack Managed Groundwater recharge Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2013 4:01:39 PM
Creation date
1/24/2013 11:19:01 AM
Metadata
Fields
Template:
Water Supply Protection
Description
related to the Platte River Endangered Species Partnership (aka Platte River Recovery Implementation Program or PRRIP)
State
CO
Basin
South Platte
Water Division
1
Date
11/18/2002
Author
Boyle Engineering Corporation
Title
Report on Estimated Cost for Expansion, Tamarack Managed Groundwater Recharge Project at Tamarack Ranch State Wildlife Area and Pony Express State Wildlife Area
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 2. Conceptual Level Estimate of Costs for Project Expansion <br />Tamarack Managed Groundwater Recharge Project <br />Tamarack and Pony Express State Wildlife Areas <br />1 of 2 <br />Description Units No. Units Unit Price Extended Price Total No. Total Cost <br />Wells: Central and East Area Tamarack Ranch SWA (14 Wells) <br />Drilling 36" hole <br />feet <br />120 <br />$35.00 <br />$4,200 <br />18" Blank Casing <br />feet <br />50 <br />$40.00 <br />$2,000 <br />18" Screen/Louver <br />feet <br />70 <br />$70.00 <br />$4,900 <br />Gravel Pack <br />cubic feet <br />640 <br />$2.60 <br />$1,664 <br />Cement <br />cubic feet <br />15 <br />$9.40 <br />$141 <br />Test Pumping <br />lump sum <br />1 <br />$800.00 <br />$800 <br />Misc. well fittings @ 5% <br />lump sum <br />1 <br />$685.25 <br />$685 <br />Sub -total wells <br />lump sum <br />1 <br />$800.00 <br />$14,390 14 $201,464 <br />Wells: West Area Tamarack Ranch SWA (7 Wells) <br />Drilling 36" hole <br />feet <br />60 <br />$35.00 <br />$2,100 <br />18" Blank Casing <br />feet <br />25 <br />$40.00 <br />$1,000 <br />18" Screen/Louver <br />feet <br />35 <br />$70.00 <br />$2,450 <br />Gravel Pack <br />cubic feet <br />320 <br />$2.60 <br />$832 <br />Cement <br />cubic feet <br />15 <br />$9.40 <br />$141 <br />Test Pumping <br />lump sum <br />1 <br />$800.00 <br />$800 <br />Misc. well fittings @ 5% <br />lump sum <br />1 <br />$366.15 <br />$366 <br />Sub -total wells <br />lump sum <br />1 <br />$800.00 <br />$7,689 7 $53,824 <br />Infiltration Gallery Pony Express SWA <br />Dewatering <br />lump sum <br />1 <br />$43,000.00 <br />$43,000 <br />Excavate for laterals <br />yards <br />2700 <br />$2.40 <br />$6,480 <br />Screen laterals <br />feet <br />100 <br />$20.00 <br />$2,000 <br />Gravel filter pack for laterals <br />yards <br />44 <br />$40.00 <br />$1,760 <br />Riser /Connection to laterals <br />lump sum. <br />1 <br />$4,800.00 <br />$4,800 <br />Filter fabric <br />square feet <br />1900 <br />$3.00 <br />$5,700 <br />Backfill <br />yards <br />2700 <br />$2.40 <br />$6,480 <br />Test Pumping <br />lump sum <br />1 <br />$800.00 <br />$800 <br />Sub -total gallery <br />$71,020 1 $71,020 <br />Well Pumps Central and East Area Tamarack Ranch <br />SWA <br />1500 gpm turbine pump <br />lump sum <br />1 <br />$4,110.00 <br />$4,110 <br />75 hp electric motor <br />lump sum <br />1 <br />$3,450.00 <br />$3,450 <br />Discharge head <br />lump sum <br />1 <br />$1,860.00 <br />$1,860 <br />Column and shafting <br />feet <br />90 <br />$91.00 <br />$8,190 <br />Strainer and misc. fittings <br />lump sum <br />1 <br />$500.00 <br />$500 <br />Motor control panel <br />lump sum <br />1 <br />$150.00 <br />$150 <br />Labor, installed <br />hours <br />9 <br />$125.00 <br />$1,125 <br />Sub -total well pumps <br />$19,385 14 $271,390 <br />Well Pumps West Area Tamarack Ranch SWA <br />1500 gpm turbine pump <br />lump sum <br />1 <br />$4,110.00 <br />$4,110 <br />75 hp electric motor <br />lump sum <br />1 <br />$3,450.00 <br />$3,450 <br />Discharge head <br />lump sum <br />1 <br />$1,860.00 <br />$1,860 <br />Column and shafting <br />feet <br />50 <br />$91.00 <br />$4,550 <br />Strainer and misc. fittings <br />lump sum <br />1 <br />$500.00 <br />$500 <br />Motor control panel <br />lump sum <br />1 <br />$300.00 <br />$300 <br />Labor, installation <br />hours <br />8 <br />$125.00 <br />$1,000 <br />Sub -total well pumps <br />$15,770 7 $110,390 <br />
The URL can be used to link to this page
Your browser does not support the video tag.