Laserfiche WebLink
• <br />• <br />Pumphouse Cost Opinion <br />noon -rin +inn Ouanttty Unit Unit Cost Total Cost Totals <br />Plant Native Riparian Shrubs #5 <br />30 <br />EA <br />$35 <br />$1,050 <br />Plant Native Cottonwoods 3" caliper) <br />6 <br />EA <br />$600 <br />$3,600 <br />Place Habitat Boulders <br />20 <br />Tons <br />$80 <br />$1,600 <br />Sub Total: <br />$12,980 <br />ITEMIZED CONSTRUCTION SUBTOTAL <br />$699,586 <br />1$699,586 <br />CONTINGENCY 40°/, <br />$174,897 <br />CONSTRUCTION SUBTOTAL <br />$874,483 <br />Construction Monitoring Services ENGINEER <br />$21,234 <br />TOTAL CONSTRUCTION COST $895,700 <br />Page 2 of 2 <br />