Laserfiche WebLink
Pumphouse Cost Opinion <br />Descriution Quantity Unit Unit Cost Total Cost Totals <br />Clfa gataln <br />Mobilization/demobilization/Bonding/Insurance <br />1 <br />LS <br />$63,144 <br />$63,144 <br />Construction Survey and Stake <br />1 <br />LS <br />$5,000 <br />$5,000 <br />Best Management Practices <br />Traffic Control <br />1 <br />LS <br />$5,000 <br />$5,000 <br />Construction Signage/Staging Fence <br />1 <br />LS <br />$1,000 <br />$1,000 <br />Plant Native Riparian Grass Mix <br />0.20 <br />AC <br />$5,000 <br />$1,000 <br />Access and Staging Repair <br />1 <br />LS <br />$2,000 <br />$2,000 <br />Protect in Place <br />1 <br />LS <br />$1,000 <br />$1,000 <br />Silt Fences <br />300 <br />LF <br />$2 <br />$600 <br />Sediment Logs <br />100 <br />LF <br />$10 <br />$950 <br />Sub Total: <br />$79,694 <br />Diversion Channel and Access <br />Diversion Structure 350 <br />1 <br />LS <br />$165,000 <br />$165,000 <br />Care of Water Pum in <br />1 <br />LS <br />$70,000 <br />$70,000 <br />Channel Grading <br />200 <br />CY <br />$36 <br />$7,200 <br />Filter Fabric <br />200 <br />SY <br />$48 <br />$9,600 <br />Filtering <br />1 <br />LS <br />$20,000 <br />$20,000 <br />Reset Diversion for Different Configurations <br />1 <br />LS <br />$57,000 <br />$57,000 <br />Oil Boom <br />1 <br />LS <br />$2,500 <br />$2,500 <br />Fish Removal <br />8 <br />hrs <br />$200 <br />$1,600 <br />Sub Total: <br />$332,900 <br />Bank Stabilization <br />Terrace Boulders Delivered & InstalWdl <br />442 <br />Tons <br />$80 <br />$35,360 <br />3-5ft Toe Boulders Delivered & Installed <br />80 <br />1 Tons <br />$80 <br />$6,400 <br />Filter Fabric <br />278 <br />SY <br />$7 <br />$1,944 <br />Excavation <br />328 <br />CY <br />$20 <br />$6,556 <br />Sub Total: <br />$50,260 <br />River Left of Island <br />Wave Blocks <br />3 <br />EA <br />$25,000 <br />$75,000 <br />3 -5ft Boulders Delivered & Installed <br />371 <br />Tons <br />$80 <br />$29,640 <br />5-6ft Boulders Delivered & Installed <br />124 <br />Tons <br />$80 <br />$9,880 <br />Excavation Sub -Grade Boulder Structure <br />303 <br />CY <br />$20 <br />$6,068 <br />Excavated Alluvium Backfill <br />61 <br />CY <br />1 $15 <br />$910 <br />Unclassified Hauloff <br />243 <br />CY <br />$35 <br />$8,496 <br />Filter Fabric <br />467 <br />SY <br />$7 <br />$3,267 <br />Sub Total: <br />$133,261 <br />River Right of Island <br />Wave Blocks <br />2 <br />EA <br />$25,000 <br />$50,000 <br />3 -5ft Boulders Delivered & Installed <br />292 <br />ITons <br />$80 <br />$23,340 <br />5-6ft Boulders Delivered & Installed <br />97 <br />ITons <br />$80 <br />$7,780 <br />Excavation Sub -Grade Boulder Structure <br />152 <br />CY <br />$20 <br />$3,034 <br />Excavated Alluvium Backfill <br />30 <br />CY <br />$15 <br />$455 <br />Unclassified Hauloff <br />121 <br />CY <br />$35 <br />$4,248 <br />Filter Fabric <br />233 <br />SY <br />$7 <br />$1,633 <br />Sub Total: <br />$90,491 <br />Landscaping <br />Topsoil and plant pit mix/ soil conditioners <br />50 <br />CY <br />$30 <br />$1,500 <br />Erosion Blanket <br />200 <br />SY <br />$9 <br />$1,800 <br />Sediment Logs <br />250 <br />LF <br />$10 <br />$2;500 <br />Plant Native Riparian Stakes <br />150 <br />EA <br />$3 <br />$450 <br />Plant Native Riparian Shrubs 1 qtj <br />30 <br />EA <br />$16 <br />$480 <br />Page 1 of 2 <br />• <br />• <br />• <br />