Pumphouse Cost Opinion
<br />Descriution Quantity Unit Unit Cost Total Cost Totals
<br />Clfa gataln
<br />Mobilization/demobilization/Bonding/Insurance
<br />1
<br />LS
<br />$63,144
<br />$63,144
<br />Construction Survey and Stake
<br />1
<br />LS
<br />$5,000
<br />$5,000
<br />Best Management Practices
<br />Traffic Control
<br />1
<br />LS
<br />$5,000
<br />$5,000
<br />Construction Signage/Staging Fence
<br />1
<br />LS
<br />$1,000
<br />$1,000
<br />Plant Native Riparian Grass Mix
<br />0.20
<br />AC
<br />$5,000
<br />$1,000
<br />Access and Staging Repair
<br />1
<br />LS
<br />$2,000
<br />$2,000
<br />Protect in Place
<br />1
<br />LS
<br />$1,000
<br />$1,000
<br />Silt Fences
<br />300
<br />LF
<br />$2
<br />$600
<br />Sediment Logs
<br />100
<br />LF
<br />$10
<br />$950
<br />Sub Total:
<br />$79,694
<br />Diversion Channel and Access
<br />Diversion Structure 350
<br />1
<br />LS
<br />$165,000
<br />$165,000
<br />Care of Water Pum in
<br />1
<br />LS
<br />$70,000
<br />$70,000
<br />Channel Grading
<br />200
<br />CY
<br />$36
<br />$7,200
<br />Filter Fabric
<br />200
<br />SY
<br />$48
<br />$9,600
<br />Filtering
<br />1
<br />LS
<br />$20,000
<br />$20,000
<br />Reset Diversion for Different Configurations
<br />1
<br />LS
<br />$57,000
<br />$57,000
<br />Oil Boom
<br />1
<br />LS
<br />$2,500
<br />$2,500
<br />Fish Removal
<br />8
<br />hrs
<br />$200
<br />$1,600
<br />Sub Total:
<br />$332,900
<br />Bank Stabilization
<br />Terrace Boulders Delivered & InstalWdl
<br />442
<br />Tons
<br />$80
<br />$35,360
<br />3-5ft Toe Boulders Delivered & Installed
<br />80
<br />1 Tons
<br />$80
<br />$6,400
<br />Filter Fabric
<br />278
<br />SY
<br />$7
<br />$1,944
<br />Excavation
<br />328
<br />CY
<br />$20
<br />$6,556
<br />Sub Total:
<br />$50,260
<br />River Left of Island
<br />Wave Blocks
<br />3
<br />EA
<br />$25,000
<br />$75,000
<br />3 -5ft Boulders Delivered & Installed
<br />371
<br />Tons
<br />$80
<br />$29,640
<br />5-6ft Boulders Delivered & Installed
<br />124
<br />Tons
<br />$80
<br />$9,880
<br />Excavation Sub -Grade Boulder Structure
<br />303
<br />CY
<br />$20
<br />$6,068
<br />Excavated Alluvium Backfill
<br />61
<br />CY
<br />1 $15
<br />$910
<br />Unclassified Hauloff
<br />243
<br />CY
<br />$35
<br />$8,496
<br />Filter Fabric
<br />467
<br />SY
<br />$7
<br />$3,267
<br />Sub Total:
<br />$133,261
<br />River Right of Island
<br />Wave Blocks
<br />2
<br />EA
<br />$25,000
<br />$50,000
<br />3 -5ft Boulders Delivered & Installed
<br />292
<br />ITons
<br />$80
<br />$23,340
<br />5-6ft Boulders Delivered & Installed
<br />97
<br />ITons
<br />$80
<br />$7,780
<br />Excavation Sub -Grade Boulder Structure
<br />152
<br />CY
<br />$20
<br />$3,034
<br />Excavated Alluvium Backfill
<br />30
<br />CY
<br />$15
<br />$455
<br />Unclassified Hauloff
<br />121
<br />CY
<br />$35
<br />$4,248
<br />Filter Fabric
<br />233
<br />SY
<br />$7
<br />$1,633
<br />Sub Total:
<br />$90,491
<br />Landscaping
<br />Topsoil and plant pit mix/ soil conditioners
<br />50
<br />CY
<br />$30
<br />$1,500
<br />Erosion Blanket
<br />200
<br />SY
<br />$9
<br />$1,800
<br />Sediment Logs
<br />250
<br />LF
<br />$10
<br />$2;500
<br />Plant Native Riparian Stakes
<br />150
<br />EA
<br />$3
<br />$450
<br />Plant Native Riparian Shrubs 1 qtj
<br />30
<br />EA
<br />$16
<br />$480
<br />Page 1 of 2