My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Board Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2013 1:20:11 PM
Creation date
1/22/2013 12:59:35 PM
Metadata
Fields
Template:
Water Supply Protection
Description
January 28-29,2013 Board Meeting Agenda
Date
1/29/2013
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />Exhibit A <br />Statement of Work <br />WATER ACTIVITY NAME — Gore Canyon Whitewater Park at Pumphouse <br />GRANT RECIPIENT — Grand County <br />FUNDING SOURCE — WSRA Colorado Basin Account and Statewide Account <br />INTRODUCTION AND BACKGROUND <br />The construction of the Gore Canyon Whitewater Park at Pumphouse on the Upper Colorado River in <br />Grand County will protect the important Non - Consumptive recreational uses of the Colorado River with <br />an associated recreational water right. <br />The Gore Canyon Whitewater Park is one small but critically important part of the multi - purpose <br />Colorado River Cooperative Agreement between Grand County, Denver Water and about 30+ west <br />slope water providers and organizations. This multi - purpose water agreement was touted by Governor <br />Hickenlooper as "a new way of doing business in Colorado." <br />As part of this agreement, Grand County is building a whitewater park on the Colorado River below <br />Gore Canyon. These grant funds will be used to construct the structures at Pumphouse. This includes <br />heavy construction in the river, bank work and re- vegetation associated with the development of the <br />structures that create the waves other hydraulic features of the park. <br />This `park and play' Whitewater Park is in an existing BLM recreational site and will provide safe and <br />easy access for play boating between the challenging Class IV section of Gore Canyon and the family <br />friendly Class II /III section from Pumphouse to State Bridge. <br />OBJECTIVES <br />The objective of the project is to take all steps necessary to complete the construction the structures in <br />accordance with the designs submitted as part of the Recreational In- Channel Design (RICD) so that the <br />Gore Canyon Whitewater Park at Pumphouse will perform as described and fill the Non - Consumptive <br />recreational needs of the Upper Colorado River. <br />TASKS <br />TASK 1— Final Design /Specifications/Preparation of Bid Documents <br />Description of Task: <br />Grand County will contract with the professional river engineering furn of RiverRestoration.org to <br />prepare the final design and specification documents that will be used in preparation of the Construction <br />Bid Documents. <br />Method/Procedure: <br />Grand County will contract with the Engineering firm to perform these services. <br />Deliverable: <br />Final Design Documents prepared by P.E., Engineering Specifications and Bid Packet. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.