My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150026 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150026 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 10:41:48 AM
Creation date
1/22/2013 9:29:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150026
Contractor Name
Ute Water Conservancy District
Contract Type
Loan
Water District
72
County
Mesa
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
prepared by CWCB staff and DISTRICT staff, all of which are incorporated herein by reference, <br />an J, based upon the feasibility report as updated and upon the EIS, the STATE determined the <br />PF OJECT to be technically and financially feasible. <br />8. At its November 1998 meeting, the CWCB approved an additional loan to the BORROWER in the <br />an ount of up to $9,600,000 from the CWCB Construction Fund and /or the Severance Tax Trust <br />Fu id Perpetual Base Account, at an interest rate of 4.75% per annum for a term of thirty (30) <br />ye irs, to finance PROJECT costs. The CWCB conditioned the loan upon the BORROWER raising <br />its water rates prior to entering into the loan contract. On April 14, 1999, the BORROWER <br />approved a motion raising its water rates effective July 1, 1999. <br />9. Pursuant to 1999 Colo. Sess. Laws, Ch. 218, Section 2, the Colorado General Assembly <br />au horized the CWCB to loan to the DISTRICT, acting by and through the BORROWER, $7,000,000 <br />fro the Severance Tax Trust Fund Perpetual Base Account, hereinafter referred to as <br />ALJ THORIZED LOAN AMOUNT, at an interest rate of 4.75% per annum for a term of thirty (30) years <br />for financing PROJECT costs. The General Assembly also authorized the CWCB to loan to the <br />DISTRICT, acting by and through the BORROWER, an additional $2,600,000 from the Construction <br />Fu id for the PROJECT, which loan will be made by an amendment to the 1995 Contract. <br />10. Th STATE acknowledges and understands that the repayment of the funds loaned, including <br />interest thereon, will come from revenues pledged for the repayment thereof from water system <br />re nues and that this obligation does not constitute a debt of the DISTRICT within the meaning of <br />an constitutional or statutory limitations. <br />11. Th.- STATE, the DISTRICT and the BORROWER acknowledge and- Und r that the BORROWER <br />ha pledged its water system revenues to repay its Water. Reve iue- Refunding Bonds, Series <br />19 5 and Series 1997, and to repay existing loans from tho STAT': - <br />12. Thp STATE now desires, by this contract, to loan mone th JRROWER for this PROJECT upon <br />ML ually agreeable terms and conditions, subject to the avaii4 ilitjc, of funding for that purpose. <br />N THEREFORE, in consideration of the mutual and dependent covenants contained herein, the <br />parties agree as follows: <br />A. The BORROWER agrees as follows: <br />1. Construction Fund Program Procedures. The following items are procedures the BORROWER <br />sh II follow during the construction phase of the PROJECT. <br />a. The BORROWER shall employ an engineer, registered in the State of Colorado, hereinafter <br />referred to as the CONSULTANT, to prepare plans and specifications for the PROJECT. <br />b. The agreement between the BORROWER and the CONSULTANT and the plans and <br />specifications must be submitted to the CWCB staff for verification of compliance with the <br />terms of this, contract prior to bid opening. Any modifications to the plans and specifications <br />must be approved in writing by the CWCB staff. <br />c. For plans and specifications for all jurisdictional dams and reservoirs, as defined by § 37 -87- <br />105, C.R.S. (1999), the BORROWER shall provide a letter of approval from the State <br />Engineer's Office prior to construction. <br />d. CWCB staff must be present at bid opening and must approve the award of the construction <br />contract. <br />e. The BORROWER shall contract for the construction of the work with responsible and capable <br />firms, hereinafter referred to as CONSTRUCTION FIRMS, which CONSTRUCTION FIRMS shall be <br />Ute Wat r Activity Enterprise and <br />Ute Wat r Conservancy District Page 2 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.