Laserfiche WebLink
AGENCY NAME: Water Conservation Board <br />AGENCY NUMBER: PDA <br />ROUTING NUMBER: <br />$7,000,000 <br />LOAN CONTRACT <br />THIS CONTRACT, made this /_ day of z/ // 2000, by and <br />between the State of Colorado for the use and benefit of a Department of Natural Resources, <br />Colorado Water Conservation Board, hereinafter referred to as the CWCB and /or STATE, and the Ute <br />Water Conservancy District, hereinafter referred to as the DISTRICT, and the Ute Water Activity <br />Enterprise, hereinafter referred to as the BORROWER and /or CONTRACTOR, P.O. Box 460, Grand <br />Junction, Colorado 81502 -0460. <br />FACTUAL RECITALS <br />1. Authority exists in the law, and funds have been budgeted, appropriated and otherwise made <br />available and a sufficient unencumbered balance thereof remains available for payment in Fund <br />Number 100, Organization YYYY, Appropriation S99, GBL UWCD, Program WTRC, Reporting <br />Category 0026, Object Code 5180, Contract Encumbrance Number C150026. <br />2. Required approval, clearance, and coordination have been mplished from and with <br />appropriate agencies. °� . 7 <br />3. Pursuant to the provisions of §§ 37 -60 -119 and (1999), the STATE is <br />authorized to loan money for the construction of water projects fpr, the,bervAt of the people of the <br />STATE, provided that the borrower assures repayment ofthkmoliey <br />4. The DISTRICT is a duly constituted water conservancy district created and operated pursuant to <br />Article 45 of Title 37, C.R.S., and located in Mesa County, Colorado. <br />5. The Ute Water Activity Enterprise was established pursuant to § 37 -45.1 -103, C.R.S. by <br />Resolution No. UW -94 -04 dated September 14, 1994 by the Board of Directors of the DISTRICT, <br />which resolution is incorporated herein by reference. The DISTRICT created the Enterprise for the <br />purpose of pursuing, continuing and conducting all of the water activities of the DISTRICT, <br />including without limitation the construction, operation, maintenance, repair and replacement of <br />the DISTRICT'S property, works, projects and facilities. <br />6. The DISTRICT and the BORROWER entered into a contract with the STATE dated March 31, 1995, <br />Contract Encumbrance No. C153670B, which the parties amended on July 10, 1996 and October <br />23, 1997 ( "1995 Contract') under which the STATE agreed to loan the BORROWER up to <br />$7,537,500 to finance the design and construction of the DISTRICT'S and BORROWER'S Plateau <br />Creek Pipeline Project (hereinafter referred to as the PROJECT). The total cost of the PROJECT is <br />estimated to be $55,360,000. <br />7. The DISTRICT and the BORROWER applied to the STATE for an additional loan of $9,600,000 to <br />finance PROJECT costs. The STATE has reviewed a feasibility study report on the PROJECT <br />compiled by Stefan, Robertson and Kirsten in 1991, a February 1998 environmental impact <br />statement (EIS) prepared for the PROJECT, and an update of the 1991 feasibility study report <br />Ute Water Activity Enterprise and <br />Ute Water Conservancy District age 1 of 13 <br />