My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP 2012 Invoices (3)
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
PRRIP 2012 Invoices (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2013 11:13:32 AM
Creation date
1/16/2013 3:33:40 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Platte River Recovery Implementation Program (PRRIP) Invoices for 2012 - Volume 3
State
CO
WY
NE
Basin
South Platte
Water Division
1
Date
1/1/2012
Author
Platte River Recovery Implementation Program (PRRIP)
Title
Platte River Recovery Implementation Program (PRRIP) Invoices for 2012 - Volume 3
Water Supply Pro - Doc Type
Budget
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EA Engineering, Science, and Technology, Inc. <br />EA Project No: 1482201 <br />Paae 2 of 2 <br />of preliminary results, virtual site tour, and Preliminary Conclusions Memo. <br />Work Projected Next Reporting Period <br />Task 0002 — Project Management and Meetings <br />• Continue conducting various informal phone calls, and provide progress report. <br />Task 007 — Additional Data Collection <br />• Submit final Fieldwork Summary Report Addendum 1. <br />Task 008 — Installation of Instrumentation (Pilot Project) <br />• Removal of some equipment after basin is dry. <br />• Salvage of water level recorders from the piezometer and stilling well and provide to <br />EDO through Steve Smith for a different project. <br />• Coordinate with subcontractor for well abandomnent of the piezometer. <br />• Receipt of subcontractor invoices. <br />Task 009 — Construction Phase Services and Operational Support (Pilot Project) <br />• Coordination with EDO, CNPPID and Contractor during site restoration activities. <br />Task 010 — Collection of Instrumentation Data <br />• Conduct downloading and data collection events about once every four weeks. Last <br />download event is scheduled for first week in March. <br />• Continue preliminary evaluation of downloaded data. <br />Task 011 — Evaluation and Reporting <br />• Continue data evaluation and report preparation. <br />Schedule <br />Project is on schedule. No schedule related issues are anticipated. <br />Nebraska Groundwater Recharge Feasibility Study Progress Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.