Laserfiche WebLink
MEMORANDUM <br />TO: Ms. Beorn Courtney <br />Platte River Recovery Implementation Program (PRRIP) <br />FROM: Dale Schlautman, EA Engineering, Science, and Teclulology, Inc. (EA) <br />COPY: File <br />RE: Progress Report — Nebraska Groundwater Recharge Feasibility Study <br />EA# 1482201 <br />DATE: 10 February 2012 <br />TIME PERIOD: 1 January 2012— 31 January 2012 <br />This progress report describes the project effort for the above time period. <br />Work Completed This Period: <br />Task 0002 — Project Management and Meetings <br />• Conducted various informal phone calls and provided progress report. <br />• Cormnunications related to ending the pilot recharge activities, and forwarding raw data <br />to Bill Hahn for groundwater model. <br />Task 007 — Additional Data Collection <br />• No activity. <br />Task 008 — Installation of Instrumentation (Pilot Project) <br />m No activity. <br />Task 009 — Construction Phase Services and Operational Support (Pilot Project) <br />• Communication and coordination with EDO, contractor, and CNPPID to for shut down of <br />pilot and plan site restoration activities at the recharge basin and water delivery system. <br />Task 010 — Collection of Instrumentation Data <br />• Conducted downloading and data collection events. <br />• Preliminary evaluation of data and forwarding of data from CNPPID, along with water <br />level results and photos, to PRRIP website for Work Group. <br />Task 011 — Evaluation and Reporting (Pilot Project) <br />• Completed preparations for Mid- Project Update with Work Group including data packet <br />Nebraska Groundwater Recharge Feasibility Study Progress Report <br />