My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP 2009 Invoices (2)
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
PRRIP 2009 Invoices (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2013 11:00:38 AM
Creation date
1/15/2013 3:21:44 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Platte River Recovery Implementation Program (PRRIP) Invoices for 2009 - Volume 2
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
1/1/2009
Author
Platte River Recovery Implementation Program (PRRIP)
Title
Platte River Recovery Implementation Program (PRRIP) Invoices for 2009 - Volume 2
Water Supply Pro - Doc Type
Budget
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PRRIP Project North Platte Restoration and Enhancement Project - Work summary for lnvoice'�of work <br />completed - March 1, 2009 to August 31, 2009. <br />September 11, 2009 <br />Page 2 <br />• TC Engineering time and expenses for reading gages and providing boats during the high flow <br />period. SEH time for monitoring and site visit and coordination of effort. Team also spent time <br />with Fish and Wildlife staff including a boat trip on the river. <br />• TC Engineering time and expenses - $ 6,535 <br />• SEH time and engineering for $5,838 <br />• Additional work for to survey properties buildings next to the river to determine based on <br />elevation how much freeboard was available between river highwater and critical structures. TC <br />completed survey and process data and SEH coordinated effort and summarized data. <br />• TC Engineering time and expenses - $ 5,373 <br />• SEH time and engineering for $2,523 <br />■ Revise and Calibrate HEC -RAS Model based on data collected during April. <br />o SEH time and expenses - $3,838 <br />■ Draft of final report and ) <br />o TC Engineering time and expenses - $.1,500 <br />rjk <br />cAdocuments and settings\rkeehn \my documents \projects \projects\north platte \invoices \memorandum on project summary march 1 2009 to august 312009 v2.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.