My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP 2009 Invoices (2)
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
PRRIP 2009 Invoices (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2013 11:00:38 AM
Creation date
1/15/2013 3:21:44 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Platte River Recovery Implementation Program (PRRIP) Invoices for 2009 - Volume 2
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
1/1/2009
Author
Platte River Recovery Implementation Program (PRRIP)
Title
Platte River Recovery Implementation Program (PRRIP) Invoices for 2009 - Volume 2
Water Supply Pro - Doc Type
Budget
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_;�k <br />SEH MEMORANDUM <br />TO: Jerry Kenny, P.E., PhD <br />FROM: Rocky J. Keehn, P.E. <br />DATE: September 1, 2009 <br />RE: PRRIP Project North Platte Restoration and Enhancement Project - Work summary for <br />Invoice of work completed - March 1, 2009 to August 31, 2009. <br />SEH No. A- PRRIP0701.00 <br />Following is a detailed summary of the invoice. The invoice was sent once project progress was made <br />towards completion of the monitoring and follow -up of the "high flow event" in April 2009. <br />Our last invoice was for work done to the end of February 2009. <br />All future work will be charged to Construction Administration Phase with a detailed explanation of the <br />work. We also made some minor changes to the fees for each phase to adjust the compensation based on <br />what we thought would be closer to the actual effort. Also, please not at this time we have not asked for a <br />cost of living increase for the contract fees proposed nearly two years ago. The task fee changes are <br />summarized below: <br />Summary of work to date and summary of work done between March 2008 and February 2009 <br />Task I (SEH Invoice Task 90000). Research and Investigation (Task 100% completed) <br />• Invoiced 100% complete on June 1, 2007. <br />Task II (SEH Invoice Task 38000). Draft Design for Each Project Component (100% complete as of <br />February) <br />• Invoiced 100% complete on March 18, 2009. <br />Task III (SEH Invoice Task 25000). Permitting/Easements (100% complete) <br />• Remaining 5% of fee was moved to Construction phase to and phase was assumed to be 100% <br />Task IV (SEH Invoice Task 48000). Final Design/Plans and Specifications (100% complete). <br />• Invoiced 100% complete on March 18, 2009.. <br />Task V (SEH Invoice Task 54000). Bid Process (100% complete). <br />• Invoiced 100% complete on March 18, 2009.. <br />Task VI (SEH Invoice Task 62000). Construction Management (90% complete). <br />• TC Engineering time and expenses for field work related to phragmite removals at the end of <br />March. This include TC time to monitor contractor and SEH time to set up contractor and answer <br />question from TC Engineer <br />• TC Engineering time and expenses - $3,096 <br />• SEH time and expenses - $2,943 <br />Short Elliott Hendrickson Inc., P.O. Box 388, Gretna, NE 68028 <br />SEH is an equal opportunity employer I www.sehinc.com 1 402.659.3531 <br />
The URL can be used to link to this page
Your browser does not support the video tag.