My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP Water Advisory Committee Meeting Notes
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
PRRIP Water Advisory Committee Meeting Notes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2013 1:00:44 PM
Creation date
1/15/2013 1:00:14 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Platte River Recovery Implementation Program (PRRIP) November 12-13, 2008 Water Advisory Committee (WAC) Meeting Packet including minutes, documents, schedule, etc.
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
11/12/2008
Author
Platte River Recovery Implementation Program (PRRIP)
Title
Platte River Recovery Implementation Program (PRRIP) November 12-13, 2008 Water Advisory Committee (WAC) Meeting Packet
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
133 <br />134 <br />135 <br />' 136 <br />137 <br />138 <br />0 <br />11' <br />1 <br />PRRIP — ED OFFICE DRAFT 6 10/02/2008 <br />the November WAC meeting to continue this discussion (most likely November 13). <br />North Platte Channel Capacity Project — Discussion on budgeting for 2008 fall removal of un- <br />sprayed phragmites, with spraying again next fall for re- growth. Jerry will revise the estimate to <br />include some spraying, potentially with proposal for matching efforts of LB701 (upper limit of <br />— $50K). <br />139 <br />14o Hydraulic Model, North Platte to Grand Island — The recent hydraulic model update by the BOR <br />141 was focused in part on bank storage, but there was not enough budget (under $25K) to gather <br />142 better cross - section data. The proposed 2009 effort would use 1 -foot contours from LIDAR <br />143 topography to update cross sections with some additional field work surveys. The LIDAR flight <br />144 will be this fall with tree leaf off, low flow, no snow. Boyle's model is not a hydraulic model; it <br />145 is a 1 -day time -step spreadsheet model. The proposed 2009 effort would be primarily to support <br />146 AMP geomorphology and pulse flow modeling. The WAC expressed concern that this tool is for <br />147 "planning" and objectives of how it will be used have not been defined enough. Jerry explained <br />148 that the BOR model was not developed with a loop and branch process; trial and error has to be <br />149 used to raise and lower the channel bottom. Don Anderson said that for pulse flow planning, the <br />150 Program needs the best tool possible to know timing and how water that is sent downstream from <br />151 the Environmental Account will travel through the system. Jerry explained that the sediment <br />152 augmentation model, SEDVEG, was used for this previously and the Program will be spending <br />153 under $50K for the BOR to make refinements to another model to see if the vegetation portion <br />154 can be added. Jerry explained that a good hydraulics model is at the basis of any sediment <br />155 transport model. A HEC -RAS model could also be used to evaluate changes associated with <br />156 phragmites and other changes in the system. The WAC raised additional questions about how <br />157 the $300K budget estimate was proposed and asked for a better understanding of how this will be <br />158 used for water management purposes. Jon Altenhofen recommended consideration of using an <br />159 extensive monitoring effort (e.g. piezometers) versus modeling. <br />160 <br />161 Channel Losses Study — The WAC recommends doing more research into what has already been <br />162 done in the past and how it could be utilized and would like a better understanding of how this <br />163 will be used for water management purposes, considering how use of OPSTUDY and the HDR <br />164 Conjunctive Management model may be used to accomplish goals versus a new HEC -RAS <br />165 model. <br />166 <br />167 Water Action Plan Update — The HDR Conjunctive Management modeling will be key to further <br />168 refining aspects of the WAP, which will be the cookbook for how the Program accomplishes <br />169 target flow goals. Jon Altenhofen recommended that the ED Office be able to run any models <br />170 and use tools developed by consultants versus relying on outside contractors. The goal is at the <br />171 end of 2009 to have the planning done and be ready to implement projects. Jon Altenhofen <br />172 indicated he believes the Program may be able to focus 2014 goals on recharge projects and then <br />173 focus construction for other additional goals. Duane Hovorka indicated concern that there may <br />174 not be enough budget to be able to start design work at the beginning of 2010. The ED Office <br />175 will work with Boyle to provide more detail on the scope, phasing it so that projects can be <br />176 implemented in 2010 and the ED Office is trained t use the planning tools. The WAC discussed <br />Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.