Laserfiche WebLink
a. At the Contractor's option, the total principal <br />repayment cost can be repaid to the State by the <br />Contractor at any time within the twenty (20) year <br />repayment period, thereby terminating this contract. <br />The repayment of the total principal repayment cost <br />prior to the end of the twenty (20) year period can be <br />done by submitting a final payment to the State equal <br />in amount to the outstanding unpaid principal of the <br />total principal repayment cost when this final payment <br />is made plus the interest accumulated on the unpaid <br />total principal repayment cost calculated _at a rate of <br />five percent (5 %) per annum for that period from the <br />last scheduled annual payment date to the date final <br />payment of the outstanding total principal repayment <br />cost principal is received by the State. <br />7. In the event of <br />contradiction between the <br />No. 1, or any of its attac <br />provisions of the Original <br />exhibits, the provisions d <br />in all respects supersede, <br />any <br />pro <br />inconsistency <br />vises of thi <br />svariance or <br />Contract Amendment <br />and any of the <br />attachments or <br />�endment No. 1 shall <br />Page 5 of 7 Pages <br />