My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153588 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153588 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2013 8:58:02 AM
Creation date
12/6/2012 1:50:22 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153588
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 89-85
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
prepare, with the assistance of the <br />engineering firm referred to in paragraph <br />B.1. above, an estimate of the funds required <br />from the State for project engineering and /or <br />construction during that month and shall <br />forward said estimate to the State not less <br />than fifteen (15) days prior to the beginning <br />of such month. <br />b. Upon receipt and approval by the State <br />of such monthly estimate, the State will, <br />within forty (40) days from the receipt of <br />such estimate, pay over to the Contractor the <br />amount of the monthly estimate or such - <br />portion thereof as has been approved by the <br />State. <br />C. No payments will be made under this <br />contract for project construction until the <br />project plans and specifications referred to <br />in paragraph B.1. above are approved by the <br />State. <br />J. Upon completion <br />in the Sum of Five Hi <br />Dollars and Eighty - <br />set forth in paragra <br />the State agrees to c <br />of the State's right, <br />to the project and <br />paragraph B.12. by <br />conveyance. <br />KMpayment to the State <br />IftWe Thousand Eight <br />Wffl-s 3,008.88), as <br />Xontractor s contract, <br />all <br />4 Wcr interest in and <br />r property described in <br />other proper <br />4. The repayment schedule (Exhibit A of the Original <br />Contract) is hereby amended as shown in Attachment B, which is by <br />this reference incorporated and made a part hereof. <br />5. The effective date of this Contract Amendment No. 1 <br />shall be seven (7) days after the day it is dated. <br />6. The Contractor pledges its full faith and credit in <br />support of this obligation and warrants that it shall lawfully <br />adopt a valid ordinance that recognizes this obligation pursuant <br />to its charter prior to the execution of this Contract. Such <br />ordinance is a condition precedent to State performance of this <br />contract. Such ordinance shall be irrepealable for the period of <br />repayment of the project contract loan. Such ordinance shall <br />specifically authorize the City to enter into this Contract. <br />Such ordinance shall specifically pledge the full faith and <br />credit of the City to repay the project contract loan in the <br />event of default. Such ordinance shall be attached hereto as <br />Attachment C and is incorporated herein by this reference. <br />Page 4 of 7 Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.