My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153573 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153573 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2012 2:00:37 PM
Creation date
12/6/2012 1:50:21 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153573
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 91-1006
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Chapter 1. General Information <br />a. Project Map. A project map will be included to show the existing <br />project. No project expansion is included, and it is not consid- <br />ered necessary to use colors to clarify the Hourglass Dam rehabil- <br />itation project. <br />b. Location. The location of the project will include the county, <br />distance and direction from the nearest major city, and the eleva- <br />tion of the project. <br />C. Climate. Climatic data will include the following: <br />(1.) Average monthly temperatures, maximum and minimum temperatures <br />of record, length of frost -free period, and average monthly <br />precipitation. <br />(2.) Wind, hail and any other applicable damaging climalogical <br />phenomena. <br />3. Chapter II. The City of Greeley. <br />a. History of the City. <br />b. Laws under which the City is orgz. <br />C. Powers and Authorities of <br />following: <br />(1) Right to eminent domairi.f <br />(2) Taxing authority <br />(3) Authority to enter into ra ual arrangements with the <br />Colorado Water Consery ard. <br />(4) Authority to vest title the project or a portion thereof <br />in the Colorado Water Conservation Board. <br />d. Financial Status, including balance sheet and statement of income <br />and expenditures for the two most recent years of operation. Lat- <br />est year full audit report will be included as an appendix to the <br />feasibility report. <br />e. Phvsical Assets, to include existing facilities and their condi- <br />tion, and major maintenance equipment owned by the City including <br />age and condition. <br />4. Chapter III. Land. Not considered to be applicable to the Hourglass Dam <br />Rehabilitation project, with the exception of: <br />a. Land ownership in the Hourglass Reservoir area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.