My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153573 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153573 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2012 2:00:37 PM
Creation date
12/6/2012 1:50:21 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153573
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 91-1006
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX A <br />Hourglass Dam Rehabilitation <br />Feasibility Study <br />Final Plan of Study <br />October 19, 1989 <br />The final plan of study for the Hourglass Dam Rehabilitation Feasibility Study <br />follows. The plan of study is organized in accordance with the outline star- <br />ting on-page 17 of the Colorado Water Conservation Board's "Guidelines" dated <br />1978. <br />PART A - GENERAL REQUIREMENTS FOR FEASIBILITY REPORTS <br />1. Letter of Transmittal. The letter of transmittal will be prepared by the <br />City of Greeley-with the assistance of McCall- Ellingsor, &- Morrill,-Inc— (MEKi _ -- <br />It will transmit the feasibility report and a c ying documents. The let- <br />ter will be signed by the designated officer W City of Greeley. <br />2. Resolution of Applying <br />Or <br />anizatio Pas i eport will be accom- <br />include; <br />panied by an <br />appropriate City <br />of Greele lu n will <br />a. <br />Amount of <br />total <br />estimated pr St. <br />b. <br />Amount of <br />applicant's con o . <br />C. <br />Amount of <br />stare <br />Financial Lance requested <br />d. <br />Amount of <br />loans <br />and grants 'rom other sources, if any. <br />e. <br />Length of <br />repayment period in years (not to exceed 40 years). <br />3. Report of Interested Agencies. Potentially interested agencies will be <br />contacted early in the Study. Copies of the draft feasibility report will be <br />supplied to them as required, and o3pies of their reports and letters will be <br />included in the application. <br />The Hourglass Dam Study is primarily intended to provide increased <br />safety and operating efficiency of an existing dam. It is a existing <br />single purpose municipal and industrial water supply facility. <br />PART B - OUTLINE FOR FEASIBILITY REPORTS <br />1. Prefacing Material. The prefacing material will include the following. <br />a. Title Page <br />b. Letter of Transmittal <br />C. Resolution of City of Greeley <br />d. Table of Contents <br />e. List of maps and exhibits <br />f. Project Summary. The briPf resume of the report contents will be <br />in the approved sample form. <br />APPENDIX A <br />
The URL can be used to link to this page
Your browser does not support the video tag.