Laserfiche WebLink
Table 3 -7 <br />Meter Replacement Costs for the installation of 400 new residential and 10 Commercial <br />radio read water Meters 50% Re Dort 1110212012 <br />for <br />St. Charles Mesa Water District Pueblo <br />Countv. Colorado <br />Description <br />Unit Cost <br />Units <br />Total Cost <br />Material Costs <br />Badger BR 25 Radio Read Meter w /Orion Data Profile <br />$192.74 <br />200 <br />$ 38,548.00 <br />Badger 55 1" Radio Read Meterw /Orion Date Profile <br />$305.16 <br />5 <br />$ 1,525.80 <br />Installation Labor Costs <br />Rate <br />Time <br />Total Cost <br />Senior Water Distribution Technician <br />$19.91 <br />80.0 <br />$1,592.80 <br />Junior Water Distribution Technician <br />$17.50 <br />80.0 <br />$1,400.00 <br />Water Distribution Technician <br />$13.75 <br />80.0 <br />$1,100.00 <br />Sub -Total <br />- <br />- <br />$4,092.80 <br />GPS Locate Costs <br />Rate <br />Time <br />Total Cost <br />Distribution System Manager <br />$31.97 <br />40.0 <br />$1,278.80 <br />Data Entry Costs <br />Rate <br />Time <br />Total Cost <br />Office Manager <br />$20.11 <br />0.0 <br />$0.00 <br />Consultant Fees <br />Rate <br />Time <br />Total Cost- <br />Young Technology Group (Engineer) <br />- <br />- <br />$1,875.00 <br />GRAND TOTAL <br />S47.320.40 <br />Summary of In -Kind Contributions <br />Material Costs <br />Badger BR 25 Radio Read Meter w /Orion Data Profile <br />$192.74 <br />141 <br />$ 27,176.34 <br />Badger 55 1" Radio Read Meter w /Orion Date Profile <br />$305.16 <br />5 <br />$ 1,525.80 <br />Installation Labor Costs <br />$4,092.80 <br />GPS Locate Costs <br />$1,278.80 <br />Data Entry Costs <br />$0.00 <br />Consultant Fees <br />$ 1,875.00 <br />Sub -Total <br />$ 35,948.74 <br />% of Total Budget <br />75.97% <br />Summary of Grant Request Costs <br />Material Costs <br />Badger BR 25 Radio Read Meter w /Orion Data Profile <br />$192.74 <br />59 <br />$ 11,371.66 <br />Sub -Total <br />$ 11,371.66 <br />% of Total Budget <br />24.03% <br />