My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
StCharlesMesa_MeterRplcmntPhase2_50%PR
CWCB
>
Water Efficiency Grants
>
Day Forward
>
StCharlesMesa_MeterRplcmntPhase2_50%PR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2012 4:11:00 PM
Creation date
12/4/2012 2:43:18 PM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Implementation Grant
Contract/PO #
OE PDA 13-31
Applicant
St Charles Mesa Water District
Project Name
Meter Replacement Program Phase 2
Title
50% Progress Report
Date
11/2/2012
County
Pueblo
Water Efficiency - Doc Type
Interim Reports
Document Relationships
StCharlesMesa_MeterRplcmntPhase2_75%PR
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
StCharlesMesa_MeterRplcmntPhase2_Applic
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
StCharlesMesa_MeterRplcmntPhase2_ApprvlLtr
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
StCharlesMesa_MeterRplcmntPhase2_FinalReport
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
StCharlesMesa_MeterRplcmntPhase2_Invoice
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
StCharlesMesa_MeterRplcmntPhase2_PO
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 1 is a summary of the Project goals, obstacles and findings: <br />Success of meeting previously <br />The first half of the installations <br />identified goals and objectives <br />proceeded on schedule. <br />Obstacles Encountered <br />Preliminary findings or <br />Accomplishments <br />Potential need for revision to the <br />scope of work and timeline <br />As of November 2, 2012, the goals and objectives of this project have been met. Most of the <br />existing meter pits were in relatively good condition. <br />The timeline for this project remains on track and shall not be altered. A small sample of the <br />existing meters shall be retained for testing, as part of the final report. <br />A copy of the timeline is also attached. <br />The total area in the first half of the 2012 Meter Replacement Project was 0.38 square miles. <br />r <br />Kenneth Alan Young, Colorado Registered Professional Engineer # 33405 Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.