Laserfiche WebLink
Table 1 is a summary of the Project goals, obstacles and findings: <br />Success of meeting previously <br />The first half of the installations <br />identified goals and objectives <br />proceeded on schedule. <br />Obstacles Encountered <br />Preliminary findings or <br />Accomplishments <br />Potential need for revision to the <br />scope of work and timeline <br />As of November 2, 2012, the goals and objectives of this project have been met. Most of the <br />existing meter pits were in relatively good condition. <br />The timeline for this project remains on track and shall not be altered. A small sample of the <br />existing meters shall be retained for testing, as part of the final report. <br />A copy of the timeline is also attached. <br />The total area in the first half of the 2012 Meter Replacement Project was 0.38 square miles. <br />r <br />Kenneth Alan Young, Colorado Registered Professional Engineer # 33405 Date <br />