My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150340 Feasibility
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150340 Feasibility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2016 9:13:17 AM
Creation date
10/10/2012 10:07:14 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-056
C150340
Contractor Name
Ridgway, Town of
Contract Type
Loan
Water District
68
County
Ouray
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Edwards, Ryan <br />From: <br />Mauss, Anna <br />Sent: <br />Monday, March 19, 2012 4:54 PM <br />To: <br />jfagan @town. ridgway.co. us <br />Cc: <br />Edwards, Ryan <br />Subject: <br />CWCB Loan Information - Town of Ridgway <br />Attachments: <br />Loan Information Sheet 2011.pdf <br />Follow Up Flag: <br />Follow up <br />Flag Status: <br />Flagged <br />Categories: Loan Correspondence <br />CWCB Loan Information <br />Date: 3/19/2012 <br />Project: Town of Ridgway — Water Supply Project <br />Contact: Joanne Fagan <br />970 - 729 -1282 <br />ifagan @town. ridgway.co. us <br />Notes from Phone Call 3119112 <br />• Town received WSRA grant for feasibility study (2009)- Applegate did study <br />• River District grant= $25K +/- to finish design (pending) <br />• Would have been called out in 2002 w/o help from water commissioner <br />• Owns lake that it has been by-passing <br />• Project is on the IP &P list for the Gunnison Basin <br />• Project site is in a closed basin <br />• Jason Ward is familiar w /project & would still need to approve plans <br />• Project = repairing tunnel & dam <br />• Lake = 350 AF (project) although decree is 700 AF (project size dependent upon on -site materials) <br />• $1.7Mest. cost <br />• Schedule — next year <br />• Town might be looking to for loan /grant package <br />Joanne: <br />I have attached a Loan Information Sheet with details about the CWCB Loan Program. <br />The process to obtain a CWCB loan is essentially preparing a Loan Feasibility Study and Application. That information is <br />reviewed and presented to our Board for approval. Link #3 below provides examples of Loan Feasibility Studies that <br />might be of assistance. <br />1) Loan Process> http://cwcb.state.co.us /LoansGrants/ water- projct- loan - program /Pages /main.aspx <br />2) Schedules /Deadlines > hftp:Hcwcb. state. co. us/Loan sGrants/water-promect-loan- <br />program/Documents/SchedulesDeadlinesWPLP.pd f <br />3) Example of a Loan Feasibility Study> http:/ /cwcb. state. co. us /LoansGrants /water - project -loan- <br />program /Pages /Loan FeasibilityStudyExamples. aspx <br />4) Loan Application > http:/ /cwcb. state. co. us /LoansGrants /water - project -loan- <br />program /Documents/WPLPLoanApplication .pdf (I'm also attaching a word version to make it easier to complete.) <br />5) Insurance Requirements > http:/ /cwcb. state. co. us /LoansGrants /water - project -loan- <br />program/ Documents / Insurance %20ReguirementsAgents.pdf <br />
The URL can be used to link to this page
Your browser does not support the video tag.