My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150341 Feasibility
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150341 Feasibility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2015 4:19:18 PM
Creation date
10/10/2012 8:36:31 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-027
C150341
Contractor Name
Pisgah Reservoir and Ditch Company
Contract Type
Loan
Water District
12
County
Teller
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Implementation Schedule <br />Task <br />Start Date <br />Finish Date <br />1: Design <br />Upon NTP * <br />NTP + 60 days <br />2: Biddin <br />Upon NTP <br />NTP + 90 days <br />3: Construction <br />NTP + 60 -90 days <br />NTP + 180 days <br />4: Management <br />Upon NTP <br />NTP + 180 days <br />Impacts <br />Impacts will be minimal. The reservoir will not be drawn down for construction. Access to the site <br />is from County Road 11, and the dam access road is entirely on Pisgah Reservoir and Ditch <br />Company property. <br />Institutional Feasibility <br />Task 1 scope includes producing drawings, specifications and bid documents suitable to obtain <br />approval from the State Engineer's Office. SEO approval is the only approval anticipated to be <br />necessary for this project. <br />Financial Feasibility Analysis <br />The Pisgah Reservoir and Ditch Company is applying for a loan from the CWCB in the amount of <br />$161,345. The estimated total cost of the project is $362,690. In addition to the loan amount, the <br />Company is asking for $25,000 in Basin WSRA funds and $136,345, in Statewide WSRA funds. The <br />Company has spent $33,923.35 on engineering costs for this project prior to this point. In addition to <br />monies already spent, the Company has committed an additional $40,000 in matching funds for this <br />project. <br />The Company requests a 30 -year note, with an interest rate of 1.75 %. <br />The Company has been saving money in anticipation of needed repairs. Financial statements show <br />a healthy reserve and annual net. No extra assessments should be required to fund debt service. <br />Wright's Reservoir is offered as collateral for the loan. <br />No TABOR issues apply. <br />See Appendix I for Financial Statements. <br />Conclusions <br />Funding by a combination of WSRA Grants and CWCB Loan ensures the financial viability of this <br />project, and also ensures that much - needed repairs will be constructed in a timely manner, thereby <br />avoiding potential SEO restrictions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.