My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Upper Colorado River Stakeholder Group Conceptual Plan for a Wild and Secnic Management Alternative June 30 2009
CWCB
>
Water Supply Protection
>
DayForward
>
6001-7000
>
Upper Colorado River Stakeholder Group Conceptual Plan for a Wild and Secnic Management Alternative June 30 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2012 2:38:04 PM
Creation date
10/5/2012 1:54:28 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Upper Colorado River Stakeholder Group Conceptual Plan for a Wild and Secnic Management Alternative June 30 2009
State
CO
Date
6/30/2008
Title
Upper Colorado River Stakeholder Group Conceptual Plan for a Wild and Secnic Management Alternative June 30 2009
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
June 30, 2008 <br />I. Conclusion <br />This Conceptual Plan lays out the Stakeholder Group's progress to date and intentions for <br />additional data gathering, analysis and collaborative planning. The Stakeholder Group will <br />continue to work together throughout the summer and fall of 2008 to gather adequate <br />information to develop more specific elements and details of the Management Plan Alternative. <br />The Management Plan Alternative may provide enhancements that exceed Wild and Scenic <br />requirements. The Stakeholder Group urges the BLM to consider this Conceptual Plan as <br />adequate progress toward a Wild and Scenic Management alternative for inclusion in its <br />Resources Management Plan revision process. The Stakeholder Group intends to submit <br />additional information to BLM as needed to satisfy NEPA requirements supporting issuance of <br />the Draft EIS, which is tentatively scheduled for the winter of 2008/2009. The goal of the <br />Stakeholder Group is to complete the detailed final Management Plan Alternative for submission <br />to and consideration by BLM prior to its issuance of a Final EIS and Record of Decision on the <br />final plan. <br />-32- <br />
The URL can be used to link to this page
Your browser does not support the video tag.