My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Letter to Jennifer Gimbel October 21 2009
CWCB
>
Water Supply Protection
>
DayForward
>
6001-7000
>
Letter to Jennifer Gimbel October 21 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2012 2:32:29 PM
Creation date
10/5/2012 1:54:25 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Letter to Jennifer Gimbel October 21 2009
State
CO
Date
10/21/2009
Author
Hunsaker, David
Title
Letter to Jennifer Gimbel October 21 2009
Water Supply Pro - Doc Type
Correspondence
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fishing (Segments 4 and 5): a range of . <br />opportunities for fishing the existing range and <br />quality of opportunities for fishing. <br />Boating (Segments 4 through 7): a range of <br />opportunities for floatboating the existing range and <br />quality of opportunities for floatboating. <br />Impairment of or a significant risk of impairment to the Provisional <br />or final ORV Indicators would be cause for elevation of this Plan to <br />BLM pursuant to Section IV.e. <br />Resource Guides <br />Streamflow- influenced ORVs may be affected by factors such as <br />flows, temperature and water quality. This Plan establishes ranges <br />for these factors, referred to as "Resource Guides," which are <br />described in Part III of the Plan. Not all stakeholders endorse these <br />Resource Guides or believe that the ranges they represent are <br />necessary to support the ORVs. Nevertheless, the Stakeholder <br />Group agrees to include these guides to inform decision - making <br />and as a trigger for implementation of the cooperative measures <br />process described in Section IV.c of the Plan. Section IV.f <br />addresses how Resource Guides will inform decisions with respect <br />to new projects and changes to existing projects requiring federal <br />approvals or requesting federal funding or other federal assistance. <br />Failure to achieve these Resource Guides may trigger the elevation <br />procedures within the Stakeholder Group as provided in Section <br />IVA of the Plan but would not independently be cause for elevation <br />of this Plan to BLM pursuant to Section IV.e. <br />c. Context of ORVs - Existing Conditions <br />i. Existing Flow Conditions <br />Figure 1 (see Attachment C) compares the average annual <br />flow at Kremmling for the 1984 — 2006 period with the <br />periods 1904 — 1919 (pre -Moffat and C -BT systems) and <br />1962 — 1984 (pre -1984 Operating Rules for Green Mountain <br />Reservoir and pre -Windy Gap). <br />Page 4 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.