My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Draft: Holbrook Lake Ditch Watershed Plan and Environmental Assesment
CWCB
>
Water Supply Protection
>
DayForward
>
6001-7000
>
Draft: Holbrook Lake Ditch Watershed Plan and Environmental Assesment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2012 3:09:26 PM
Creation date
8/20/2012 1:52:14 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Draft: Holbrook Lake Ditch Watershed Plan and Environmental Assesment
State
CO
Date
9/8/2000
Title
Draft: Holbrook Lake Ditch Watershed Plan and Environmental Assesment
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
It is expected that 80 long -term land treatment contracts will be written during the <br />project's life. Approximately 9,000 acres will be treated through project action. <br />Practices to be installed for this project action include: <br />9,000 acres with irrigation water management. <br />2,000 acres of nutrient management. <br />500 acres of pest management. <br />1,000 acres residue management. <br />90,000 ft. of ditch lining <br />60,000 ft. of pipelines <br />50,000 ft. of gated pipe <br />400 ac. of land leveling <br />20,000 ft. of underground drainage <br />1,400 ac. polyacrylamides <br />4 wetland multi use ponds <br />10 ac. of wetland creation <br />5 ac. of wetland enhancement <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.