My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perferred Storage Options Plan (PSOP) Meeting Minutes June 29 2004
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Perferred Storage Options Plan (PSOP) Meeting Minutes June 29 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2013 10:36:41 AM
Creation date
8/14/2012 3:39:26 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Perferred Storage Options Plan (PSOP) Meeting Minutes June 29 2004
State
CO
Date
6/29/2004
Author
Miller, Margie
Title
Perferred Storage Options Plan (PSOP) Meeting Minutes June 29 2004
Water Supply Pro - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PSOP Meeting Minutes — June 29, 2004 <br />Page 2 <br />chance the legislation would pass. The District will provide the Committee and participants with <br />a copy of H.R. 4691. <br />A question was asked regarding a possible District -wide vote and what would happen to those <br />that have been paying for the expansion process so far. It was agreed if an ad valorum tax is <br />approved by District voters, participants would need to be refunded the costs they had paid. In <br />reply to a question by Joe Kelley it was noted that the 2013 time frame would slip if the <br />legislation isn't passed this year. <br />MASTER CAPACITY CONTRACT <br />Lee Miller reported that a draft MOU with the U.S. Bureau of Reclamation has been sent to <br />Reclamation with a three week comment period. The MOU will be distributed to the Committee <br />for comment then taken to the Board of Directors for approval by September. The MOU will <br />address the NEPA process, as well as the Colorado Springs Utilities use of Excess Capacity with <br />the Southern Delivery System. <br />The next meeting is scheduled for July 27, 2004 at 11:00 a.m., to coincide with the Arkansas <br />Valley Conduit meeting held at the District office. The meeting was adjourned at 11:15 a.m. <br />Margie Miller, Engineering Support Specialist Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.