My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fiscal Year 2003: Performance Report U.S. Department of Agricultire Natural Resources Conservation Service
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Fiscal Year 2003: Performance Report U.S. Department of Agricultire Natural Resources Conservation Service
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2012 2:44:11 PM
Creation date
8/14/2012 1:47:42 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Fiscal Year 2003: Performance Report U.S. Department of Agricultire Natural Resources Conservation Service
State
CO
Date
3/1/2003
Title
Fiscal Year 2003: Performance Report U.S. Department of Agricultire Natural Resources Conservation Service
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Strategic Goal 3: Reduce risks from drought and <br />flooding to protect individual and community health <br />and safety. <br />There are two objectives for Strategic Goal 3. With one <br />exception, targets for indicators were met. The excep- <br />tion is construction of flood control structures, which is <br />greatly affected by weather and by the availability of <br />non - federal funds. <br />Objective 3.1 — Protect upstream watersheds from <br />flood risks. <br />00 <br />Hawall <br />AI: <br />o <br />`" �.... 1 —1,999 <br />4 Pacific Basin -- -- 2,000 — 9,999 <br />Palau — ' Northern 4 __ Marshall lslantls . -. - <br />Metlanaz Mto —sla <br />a hm 10,000 — 49,999 <br />encan Samoa <br />50,000 or more <br />maa lo: m7708 <br />Figure 29. Conservation systems applied to address flooding concerns. <br />Puerto Rico/ U.S. Won lslantls <br />Source: NRCS, Performance and <br />Results Measurement System, <br />October 2003, <br />Indicator: Watershed infrastructure <br />rehabilitation plans developed: <br />Target: 17 plans <br />Actual: 16 plans <br />Analysis: 95 percent of the target <br />was met. <br />Indicator: Watershed infrastructure <br />rehabilitation plans installed: <br />Target: 9 plans <br />Actual: 12 plans <br />Analysis: The target was exceeded by <br />33 percent. <br />Indicator: Watershed plans and surveys <br />approved: <br />Target: 5 plans <br />Actual: 5 plans <br />Analysis: The target was achieved. <br />Indicator: Flood control structures <br />completed: <br />Target: 124 structures <br />Actual: 60 structures <br />Analysis: Forty -eight percent of the tar- <br />get was achieved. Several factors affect <br />completion of construction work. These <br />include the availability of federal and <br />local funds, the contracting and bidding <br />process, weather, and unanticipated situ- <br />ations that occur during the actual con- <br />struction. <br />Indicator: Conservation systems <br />applied to address flooding concerns: <br />Target: 3,209,000 acres <br />Actual: 5,061,000 acres <br />Analysis: The target was exceeded by <br />nearly 60 percent. <br />Fiscal Year 2003 Performance Report 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.